39
Revision date: 03.21.18
115295
10a
AERATION SYSTEM – STONE PLACEMENT (FISH TANKS)
Use these parts for fish tank aeration system:
• (4) AQ116 (6") Air Stone 3/8" Barb
(A)
• WF1060A Braided Hose
(B)
• FA8006B Loop Clamps
(C)
• FA4572
Tek
Screws
(D)
• (5) WF0021 3/8" Barb Tee
(E)
125 Gallon Tank — Top View
FISH TANK
WF0021
3/8" Barb Tees
Complete these steps:
1. Locate parts noted at the right and construct four (4) stone and hose assemblies. Cut each
section of hose at 36" and slide an AQ116 stone onto one end of each hose.
2. Using diagrams and photos on this page, evenly space hose and stone assemblies around
tank and connect using WF0021 barb tees and short hose sections.
3. Position final tee barb in a location that allows easy connection to main air line from air pump.
4. Secure entire assembly to tank collar using clamps and FA4572 Tek screws.
5. Repeat for remaining fish-holding tanks if present. (Does not apply to System I: #115295,
which has only one fish-holding tank.)
6. Continue by assembling air stone manifolds for raft bed.
Aeration System
A
B
C
E
B
B
E
C
D
Connect main air supply
from air pump here.