Faithtech FT68200 Operation Manual
26
485A:
485 communication port A
485B:
485 communication port B
GND :
signal ground
CANH:
CAN communication H port
CANH:
CAN communication L port
OUT:
output TTL level signal (in AUTO test, when the result is PASS, outputs high level)
INHIBIT:
External control signal input
IN:
Used for time measurement function to measure external signal
GND:
Signal ground
11
AC INPUT socket
2.6. Installation
2.6.1. Preparation before connecting AC Input
When installing, make sure that the air inlet and outlet of the electronic load keep a
clearance of more than 1 meter with other objects to facilitate air circulation.
Do not place objects weighing more than 40kg on the electronic load.
WARNING: To prevent electric shock and damage to the instrument, please
confirm the following items before powering on the instrument.
Ensure that the AC supply voltage matches the rated AC input voltage of the load.
Ensure load power switch is turned off before plugging in the power cord.
Please use the power cord provided by our company.
The electronic load provides chassis grounding through a three-core power cord.
Ensure the load is well grounded before operating the load.
Summary of Contents for FT68200 Series
Page 9: ...Faithtech FT68200 Operation Manual 3 1 3 2 7U 8kW 10kW 12kW...
Page 10: ...Faithtech FT68200 Operation Manual 4 1 3 3 11U 14kW 16kW 18kW...
Page 11: ...Faithtech FT68200 Operation Manual 5 1 3 4 14U 20kW 22kW 24kW...
Page 12: ...Faithtech FT68200 Operation Manual 6 1 3 5 20U 30kW 36kW...
Page 13: ...Faithtech FT68200 Operation Manual 7 1 3 6 26U 42kW 48kW...
Page 14: ...Faithtech FT68200 Operation Manual 8 1 3 7 32U 54kW 60kW...