background image

INSTALLATION OF THE BARRIER BEAM AND POSSIBLE COMBINATIONS

1)

loosen the screws located underneath the 

coupling clamp.

!

2)

Insert the coupling clamp to the halfway point 

(note the horizontal arrow indicators).

!

!

3)

Insert the other barrier beam section until it contacts 

the first and then tighten the clamp screws.

2.10 metres

3.20 metres

R532

R532 aluminium 

barrier beam

FIG. 9

INSTALLATION:

The 

R532

 aluminium barrier beam is attached to the beam clamp located on the side of the 

housing cabinet, facing the entrance that is to be controlled with the barrier. 

To perform this operation it is first of all necessary to loosen the eight attachment screws 

on the beam clamp then insert the barrier beam, so that the end with the black plastic cap 

extends slightly beyond the clamp, to then finally tighten the attachment screws (Fig. 9).

 

4

TURN IT UPSIDE DOWN

4

FIG. 10

R532

R532

R532

FIG. 11

Barrier beam  

3.20

   "                 

2.10 + 2.10 = ............... 4.20

   " 

3.20 + 2.10 = ............... 5.30

   "                 

3.20 + 3.20 = ............... 6.40

   "                 

3.20 + 2.10 + 2.10 = .... 7.40

   "                 

3.20 + 3.20 + 2.10 = ... .8.50

       ..................................................... 

metres 

2.85

 

 

            ...............

    "     

3.85

 

 

            ...............

    "     

4.95

 

 

            ...............

    "     

6.05

 

 

            ...............

    "     

7.05

 

 

            ...............

    "     

8.15

Actual length maximum 

dimensions

(metres)

Net length for the

roadway

(metres)

P O S S I B L E  C O M B I N AT I O N S :

The R532 barrier beam is provided in two modules: of 

2.10 metres

 and 

of 

3.20 metres

, with the possibility of making up barrier beams of 

different lengths, as represented in the table in Fig.11.

Beam clamp with 8 

attachment 

screws

LED 

signal lamp 

always 

lighted

 

R532 aluminium barrier beam

Union of the two R532 barrier 

beams with the expandable 

coupling clamp

coupling clamp

Red reflective adhesive (optional) Quantity 

to be defined based upon the length of the 

barrier beam.

The union of the two barrier beams is possible utilising the 

coupling clamp

, which 

has the characteristic of expanding when the screws are tightened and contracting 

when the screws are loosened (Fig. 10).

Net length   

L

Actual Length   

X

X

L

Bayt 980

page 

6

Made in Italy

the gate opener

Summary of Contents for BAYT 980

Page 1: ...8 metres wide Version with aluminium fencing Version with cabled hinged road barrier beam Folding or fixed leg with yoked pedestal Fully convertible to right and left versions BAYT 980 Oleodinamica Fi...

Page 2: ...of the accessories there are no sources of electromagnetic disturbances such that the magnetic electromagnetic fields of any possible metallic mass detection loops and of all the system command and c...

Page 3: ...stal with yoke 5 Base foundation in concrete 500x500x600 mm 6 50mm conduit for service cabling 7 Level both sides 8 Four M14 anchor bolts that extend for 65 mm Internal side of the closure of the driv...

Page 4: ...ormed after having set the Bayt 980 foundation plate at a distance determined by the length of the barrier beam from the fixed pedestal 2 80 mm out of line from the corner of the housing cabinet base...

Page 5: ...s in the output of their respective electronic programmer terminals Bayt 980 LH Left FIG 7 HOW TO MAKE THE LEFT HANDED BAYT INTO A RIGHT HANDED BAYT AND VICE VERSA BAY T 980 BAY T 980 Bayt 980 RH Righ...

Page 6: ...UPSIDE DOWN 4 FIG 10 R532 R532 R532 FIG 11 Barrier beam 3 20 2 10 2 10 4 20 3 20 2 10 5 30 3 20 3 20 6 40 3 20 2 10 2 10 7 40 3 20 3 20 2 10 8 50 metres 2 85 3 85 4 95 6 05 7 05 8 15 Actual length ma...

Page 7: ...ith aluminium fencing length metres 3 80 length metres 4 75 length metres 5 89 length metres 6 84 length metres 7 98 R532 Coupling strut FIG 13 INSTALLATION OF COUNTERWEIGHTS ON THE BAYT 980 F D E D 2...

Page 8: ...ay closure C to be covered The length C is given by the sum of A B Ceiling height H Barrier beam length A Metal cable length L Opening time 2 50 m 2 70 m 2 80 m 3 00 m 3 70 m 4 10 m 1 60 m 1 80 m 1 90...

Page 9: ...In order to install the Polo 44 photocells and the Prit 19 selector switch on the housing cabinet it is necessary to remove the protective covers 22 unscrewing the M8 nut 20 from inside of the cabine...

Page 10: ...CT 7 3 Open Close normal Reserve direction on each impulse Step by step 2 DIP SWITCH 2 ON Does not reverse on opening OFF Reverses direction on every impulse 5 DIP SWITCH 5 ON Step by Step with interm...

Page 11: ...n Italy 1224 26 08 M Traffic signal PCB TIME PAUSE F1 F2 F3 16 17 18 19 20 21 22 1 2 3 4 5 6 7 8 9 10 11 12 ON 24 Vdc 150mA _ NEUTRAL PHASE COMMON 18 20 19 16 17 21 22 M 1 2 3 4 5 6 7 8 9 10 11 12 13...

Page 12: ...e 13 24mm spanner Important ADJUSTMENT OF THE BARRIER BEAM IN CLOSING POSITION Fig 23 In closing the barrier beam must be horizontal therefore the adjustment is performed with the piston rod completel...

Page 13: ...NOT Vertical NOT Horizontal Half stroke Important FIG 25 Adjustment flange RING NUT C3 anti clockwise direction Rh Loosen The barrier beam goes beyond the perpendicular and stops The barrier beam sto...

Page 14: ...ng rod 3rd Lower attachment pin yoke reservoir piston Cos 982 GREASE every three months FIG 27 Periodically it is necessary to perform maintenance to the Bayt 980 barrier injecting grease by way of su...

Page 15: ...servoir of the Cos 982 the piston must be perpendicular to the housing cabinet of the Bayt 980 In the Cos 982 hydraulic piston it is possible to adjust the thrust force necessary for the movement of t...

Page 16: ...e installer must apply all safety regulations to it The same installer must also issue his her own Declaration of Conformity The manufacturing firm assumes no responsibility for the improper use of th...

Page 17: ...mechanism according to the provisions of the law is a machine and therefore the installer must apply all safety regulations to it The same installer must also issue his her own Declaration of Conformi...

Page 18: ...Red Colour of painted cover and door Textured metalized 55 100 3 200 700 170 850 20 1752 840 990 150 150 70 86 175 200 Aluminium fencing to be attached to the bottom of the barrier beam Modules of 0...

Page 19: ...Red Door and top colour Metallic grey pebbled 40 C with specific optional accessories Ref General Catalogue PERFORMANCE 4 s 4 20 m beam Frequency of use very intensive Service cycle opening 4 s dwell...

Page 20: ...o Counterweights no Spring Barrier beam 3 20 m no Fence no Cables no Counterweights piston 40 with Spring Barrier beam 4 20 m Barrier beam 5 30 m Barrier beam 6 40 m with Spring with Spring Barrier be...

Reviews: