INSTALLATION OF THE ANCHORING PLATES FOR TWO BARRIERS

Important:

 At the moment of the attachment of the housing 

cabinet on top of the anchor plate, it is necessary to pay 

attention to the insertion of the electrical cable conduit as 

well, having it pass inside of the two holes in the base of 

the housing cabinet.

B

3

5

6

4

3

A

BAYT 980

Oleodinamica

80 mm

IMPORTANT

DIMENSION

4

13

5

5

11

6

12

10

7

8

9

2

  1. 

One pair of Fit 55 photocells

 

  2. 

Fixed pedestal with yoke  

  3. 

Anchor bolts

  4. 

0.54 m Column

  5. 

0.30 x 0.30 x 0.20 m Concrete 

 

block for photocell 

  6. 

Important dimension 80 mm 

  7. 

ø20 mm flex conduit for 

 

connection of cabling for fixed 

 

pedestal with yoke for the 

 electromagnet 

  8. 

ø20 mm flex conduit for 

 

photocell connection cabling 

  9. 

Derivation well 

10. 

ø50 mm flex conduit for barrier 

 

and accessories connection 

 cabling 

11. 

0.5 x 0.5 x 0.6 m 

 

Concrete block 

12. 

ø50 mm flex conduit for 

 

electrical power supply cabling 

13. 

0.304 x 0.354 m Anchor plate

For the installation of the 

"Fixed pedestal with yoke"

 - 2 - it is necessary to arrange a service conduit for the passage of electrical cabling for the 

photocells or for a possible application of the electromagnet (optional) anchoring the "Aluminium Barrier Beam" between the barrier and the fixed 

pedestal with yoke - 2 -; this operation must be performed after having set the Bayt 980 foundation plate at a distance determined by the length of 

the barrier beam from the fixed pedestal - 2 - 80 mm out of line from the corner of the housing cabinet base (Fig. 5). 

Once the 

Anchor Plate

 Anchor Plate has been well set in the ground (it is necessary to wait until the concrete has set), the Bayt 980 

housing cabinet

 

may be installed and then tighten the four 

M14 hexagonal nuts

 securely with their relative 

washers

 (screwing them down tight on the anchor bolts 

extruding from the base of the cabinet) as illustrated in Fig. 6.

  1. 

Right handed - 

RH

 - Bayt 980 

 

Hydraulic Barrier 

 

(seen from outside)

 

  2. 

Left handed - 

LH 

- Bayt 980 

 

Hydraulic Barrier 

 

(seen from outside)

 

  3. 

Anchor plate 304 x 354mm 

  4. 

ø50mm conduit for connection 

 

of cabling between the two 

 barriers 

  5. 

M14 anchor bolts - 4 pcs. 

 

for each barrier 

  6. 

ø50mm conduit for service 

 cabling 

1

5

2

RH

LH

FIG. 4

INSTALLATION OF THE FIXED PEDESTAL WITH YOKE

View from the door 

side inside property

!

Tighten the four M 14 

hexagonal nuts with

the washers supplied

A

LH

FIG. 6

3

1

1

4

For installations that require two Bayt 980 roadway barriers it is necessary to arrange underground electrical conduit for communication 

between the two housing cabinets, for the connection of the photocells or other accessories for the service cabling (Fig. 4).

FIG. 5

Version      

A

RH

M14

Housing 

cabinet

!

Insert the conduit inside 

of the cabinet passing 

by way of the two holes 

in the anchor plate.

!

Bayt 980

page 

4

Made in Italy

the gate opener

Summary of Contents for BAYT 980

Page 1: ...8 metres wide Version with aluminium fencing Version with cabled hinged road barrier beam Folding or fixed leg with yoked pedestal Fully convertible to right and left versions BAYT 980 Oleodinamica Fi...

Page 2: ...of the accessories there are no sources of electromagnetic disturbances such that the magnetic electromagnetic fields of any possible metallic mass detection loops and of all the system command and c...

Page 3: ...stal with yoke 5 Base foundation in concrete 500x500x600 mm 6 50mm conduit for service cabling 7 Level both sides 8 Four M14 anchor bolts that extend for 65 mm Internal side of the closure of the driv...

Page 4: ...ormed after having set the Bayt 980 foundation plate at a distance determined by the length of the barrier beam from the fixed pedestal 2 80 mm out of line from the corner of the housing cabinet base...

Page 5: ...s in the output of their respective electronic programmer terminals Bayt 980 LH Left FIG 7 HOW TO MAKE THE LEFT HANDED BAYT INTO A RIGHT HANDED BAYT AND VICE VERSA BAY T 980 BAY T 980 Bayt 980 RH Righ...

Page 6: ...UPSIDE DOWN 4 FIG 10 R532 R532 R532 FIG 11 Barrier beam 3 20 2 10 2 10 4 20 3 20 2 10 5 30 3 20 3 20 6 40 3 20 2 10 2 10 7 40 3 20 3 20 2 10 8 50 metres 2 85 3 85 4 95 6 05 7 05 8 15 Actual length ma...

Page 7: ...ith aluminium fencing length metres 3 80 length metres 4 75 length metres 5 89 length metres 6 84 length metres 7 98 R532 Coupling strut FIG 13 INSTALLATION OF COUNTERWEIGHTS ON THE BAYT 980 F D E D 2...

Page 8: ...ay closure C to be covered The length C is given by the sum of A B Ceiling height H Barrier beam length A Metal cable length L Opening time 2 50 m 2 70 m 2 80 m 3 00 m 3 70 m 4 10 m 1 60 m 1 80 m 1 90...

Page 9: ...In order to install the Polo 44 photocells and the Prit 19 selector switch on the housing cabinet it is necessary to remove the protective covers 22 unscrewing the M8 nut 20 from inside of the cabine...

Page 10: ...CT 7 3 Open Close normal Reserve direction on each impulse Step by step 2 DIP SWITCH 2 ON Does not reverse on opening OFF Reverses direction on every impulse 5 DIP SWITCH 5 ON Step by Step with interm...

Page 11: ...n Italy 1224 26 08 M Traffic signal PCB TIME PAUSE F1 F2 F3 16 17 18 19 20 21 22 1 2 3 4 5 6 7 8 9 10 11 12 ON 24 Vdc 150mA _ NEUTRAL PHASE COMMON 18 20 19 16 17 21 22 M 1 2 3 4 5 6 7 8 9 10 11 12 13...

Page 12: ...e 13 24mm spanner Important ADJUSTMENT OF THE BARRIER BEAM IN CLOSING POSITION Fig 23 In closing the barrier beam must be horizontal therefore the adjustment is performed with the piston rod completel...

Page 13: ...NOT Vertical NOT Horizontal Half stroke Important FIG 25 Adjustment flange RING NUT C3 anti clockwise direction Rh Loosen The barrier beam goes beyond the perpendicular and stops The barrier beam sto...

Page 14: ...ng rod 3rd Lower attachment pin yoke reservoir piston Cos 982 GREASE every three months FIG 27 Periodically it is necessary to perform maintenance to the Bayt 980 barrier injecting grease by way of su...

Page 15: ...servoir of the Cos 982 the piston must be perpendicular to the housing cabinet of the Bayt 980 In the Cos 982 hydraulic piston it is possible to adjust the thrust force necessary for the movement of t...

Page 16: ...e installer must apply all safety regulations to it The same installer must also issue his her own Declaration of Conformity The manufacturing firm assumes no responsibility for the improper use of th...

Page 17: ...mechanism according to the provisions of the law is a machine and therefore the installer must apply all safety regulations to it The same installer must also issue his her own Declaration of Conformi...

Page 18: ...Red Colour of painted cover and door Textured metalized 55 100 3 200 700 170 850 20 1752 840 990 150 150 70 86 175 200 Aluminium fencing to be attached to the bottom of the barrier beam Modules of 0...

Page 19: ...Red Door and top colour Metallic grey pebbled 40 C with specific optional accessories Ref General Catalogue PERFORMANCE 4 s 4 20 m beam Frequency of use very intensive Service cycle opening 4 s dwell...

Page 20: ...o Counterweights no Spring Barrier beam 3 20 m no Fence no Cables no Counterweights piston 40 with Spring Barrier beam 4 20 m Barrier beam 5 30 m Barrier beam 6 40 m with Spring with Spring Barrier be...

Reviews: