5. Temporarily
position the gate side
mounting bracket.
(horizontal position
does not matter, vertical position on the
gate is the position you are matching to
the post bracket.)
Position your assem-
bled gate mounting along the previously
drawn vertical line and level the angled
piece with the horizontal piece of the gate
mounting bracket using a level. Mark
your holes, drill and attach the brackets
using 4) 3/8” carriage bolts.
6.
Assemble the rear fitting to the operator as shown below.
7. Run the 5 wires from the arm(s) to the control board as seen in section 3.
8.
Set the operator for manual operation. And extend the operator arm to a near full extended
position.
2.5