COMMISSIONING OPERATIONS
36
Chapter 10
Chapter 10
COMMISSIONING OPERATIONS
MOUNTING THE TILES (ONLY LUCREZIA IDRO)
The tiles mounting operations must be carried out by an authorised technician.
Remove the 4 fi xing screws of the 2
1.
cast iron sides as indicated in the drawing.
Remove the 2 screws fi xing the upper grate.
2.
Position the central tile in the appropriate
3.
iron hooks.
Fix the upper grate with the 2 previously
4.
removed screws.
fi gure 10.1
fi gure 10.2
Summary of Contents for LUCREZIA IDRO LCD
Page 2: ...2 ...
Page 4: ...4 ...
Page 44: ...etichetta codice a barre QUALITY CONTROL 44 QUALITY CONTROL ...
Page 45: ...45 Notes ...
Page 46: ...46 Notes ...
Page 47: ...47 Notes ...