39
HPS-III-L2X-Heißkanalsystem_Montage_BA_V-2-0_EN
Installation of L2X Drop-in hot runner systems
Picture 26: Installation - inserting the system
z347-04
1. Apply a thin coat of high performance grease (see chap-
ter „5.3.1 Tools and operating materials“) to the centring
aids (pos. 14). Slide the system carefully over the cent-
ring aids and insert it into the nozzle retainer frame plate
(pos. 53). Avoid tilting in order not to damage the sealing
collars of the tip inserts or the screw-on gate bushes.
2. Unscrew and remove the centring aids (pos. 14).
3. Unscrew and remove the attachment swivels A (pos. a).
Screw the manifold to the nozzle retainer frame plate
(pos. 53) by using socket head screws M8 with flat head
(pos. 13, DIN 6912 - min. 8.8) and plain washers (pos.
13.1, ISO 7092). Screw the socket head screws in to the
stop, then tighten with matching torque. See chapter
„9.2 Tightening torques for manifold screw connections
and retaining screws“. Before installation apply high
temperature installation paste (see chapter „5.3.1 Tools
and operating materials“) to the socket head screws
(pos. 13).
Picture 27: Installation - screw connecting the system
z347-05
Installation
Suspended load
Death and severe crushing of body or extremities.
•
Keep clear of and do not pass under suspended loads.
•
Keep clear of suspended loads while they are being transported.
•
Do not touch lifting devices and lifting accessories while lifting the
load.
•
Only lift, transport and set down loads, if you have received ap-
propriate training.
•
Only use suitable and undamaged lifting devices and lifting
accessories which are checked regularly.
•
Do not exceed the maximum load limit of lifting accessories.
Sharp edges and heavy components
•
Cut injuries to body and extremities, mainly to the hands.
•
Crushing of fingers or hand.
Hot surfaces
Burns to the body caused by hot surfaces.
WARNING!