4
HPS-III-Nadelverschluss-Heißkanalsystem_Inhalt_BA_V-2-0_EN
5.1.4 Attachment points ....................................................................................................................................................... 22
5.1.5 Working load limit for lifting accessories and slings .................................................................................................... 22
5.1.6 Removal from transport crate ...................................................................................................................................... 24
5.1.7 Transport and movement during installation ............................................................................................................... 24
5.2
General safety instructions .......................................................................................................................................... 26
5.3
Technical Requirements .............................................................................................................................................. 29
5.3.1 Tools and operating materials ..................................................................................................................................... 29
5.3.2 Standard parts ............................................................................................................................................................. 32
5.4
Checks before installation ........................................................................................................................................... 33
5.4.1 Notes on mould layout ................................................................................................................................................ 33
5.4.2 Standard dimensions of hot runner systems .............................................................................................................. 33
5.4.3 Dimensions to be checked for a HPS III hot runner system with HPS III-S nozzles
for standard installation and front installation .............................................................................................................. 34
5.5
Installation of HPS III valve gate hot runner systems .................................................................................................. 36
5.5.1 Installation of valve gate systems with individual drive units and synchronous plate systems
for HPS III-S nozzles for standard and front installation ............................................................................................. 36
5.5.2 Installation of a HPS III-S valve gate nozzle ............................................................................................................... 38
5.5.3 Manifold installation ..................................................................................................................................................... 40
5.5.4 Installation of valve gate systems with individual drive units for HPS III-S nozzles
for standard and front installation ................................................................................................................................ 42
5.5.5 Drive unit integrated in clamping plate (version 1) ..................................................................................................... 45
5.5.6 Drive unit integrated in clamping plate (version 2) - .................................................................................................... 49
5.5.7 Drive unit placed on manifold (coupled) ..................................................................................................................... 53
5.5.8 Drive unit placed on manifold (screwed-on) (version 1) .............................................................................................. 56
5.5.9 Drive unit placed on manifold (screwed-on) (version 2) .............................................................................................. 60
5.5.10 Installation of valve pin ................................................................................................................................................ 64
5.5.11 Electric drive unit ......................................................................................................................................................... 66
5.5.12 Installation of synchronous plate valve gate systems for HPS III-S nozzles for standard and front installation ......... 70
5.5.13 Drive unit integrated in clamping plate (version 2) for synchronous plate systems - .................................................. 72
5.5.14 Installation of the synchronous plate version 1 ........................................................................................................... 73
5.5.15 Installation of the guiding system version 1 for synchronous plate systems ............................................................... 74
5.5.16 Installation of the synchronous plate and guiding system version 2 ........................................................................... 76
5.5.17 Installation of the valve pin (for version 1 and 2) ......................................................................................................... 78
5.5.18 Adjusting the valve pin length by adapting the spacer bushings (for version 1 and 2) ............................................... 79
5.5.19 Dimensional check for adjusting the valve pin length (for version 1 and 2) ................................................................ 80
5.5.20 Installation of a hot half with HPS III valve gate nozzles ............................................................................................ 82
5.6
Electrical connection of hot runner systems ................................................................................................................ 86
5.6.1 Safety instructions ....................................................................................................................................................... 86
5.6.2 General information ................................................................................................................................................... 88
5.6.3 Wiring of 1-drop hot runner systems ........................................................................................................................... 92
5.6.4 Wiring of 2-drop hot runner systems ........................................................................................................................... 93
5.6.5 Wiring of 4-drop hot runner systems (manifold with 2 control zones) ......................................................................... 94
Content
Summary of Contents for HPS III
Page 2: ......
Page 116: ...116 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN...
Page 122: ...122 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...
Page 126: ...126 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...