8
HPS-III-Heißkanalsystem_Vorspann_BA_V-2-0_EN
General remarks
1.4 Conventions
1.4.1 Instructions and system responses
Operating steps that have to be carried out by the operator are displayed as a numbered list. The sequence of the steps has
to be adhered to.
Example:
1. Operating step 1
2. Operating step 2
1.4.2 Enumerations
Enumerations without mandatory sequence are displayed as a list with bullet points.
Example:
•
Point 1
•
Point 2
1.4.3 Abbreviations
The following terms and abbreviations are used in the operating manual:
Abbreviation
Meaning
PPE
Personal Protective Equipment
HPS
High Performance Systems
EU
European Union
BR
Installation space
H1
Manifold height
H2
Manifold top pressure pad
H3
Manifold pressure pad with
cen top pressure pad
H4
Manifold top pressure pad +
bottom pressure pad
P
Height of nozzle retainer frame plate
B
Height of top pressure pad
KH
Nozzle body height
X
Nozzle length (lower edge of nozzle
body to article surface)
∆S
Gap dimension Delta S
R
A
Sprue bush radius
R
M
Machine nozzle radius
N
Height of hold-down device
HR
Retainer ring height
G
Height from centre axis of tip to end of
nozzle
X
X dimension of nozzle
T
K1
/ T
K2
/ T
K3
Standard dimensions to determine
gap dimension
G
Thread
P
Fit
SW
Width across flats
T
Blueing area
Abbreviation
Meaning
m
Mass
ρ
Density
V
Volume
L x B x H
Length x width x height (e.g. mould
plate, hot half)
F
Force
M
Bending moment
T
HK
Hot runner temperature
(processing temperature)
T
WZ
Mould temperature
∆T
Difference T
HK -
T
WZ
Chart 1: Terms and abbreviations
Summary of Contents for HPS III
Page 2: ......
Page 116: ...116 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN...
Page 122: ...122 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...
Page 126: ...126 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...