134
HPS-III-Heißkanalsystem_Servicehinweise_Außerbetriebnahme_BA_V-2-0_EN
Decommissioning
8. Decommissioning
NOTE!
•
All operating materials and fluids must be emptied, collected and disposed in accordance with the local
regulations.
•
Follow the safety instructions for transport with lifting accessories (see chapter „5.1 Transport“).
•
Only specialised staff is allowed to carry out any deinstallation work.
HAZARD!
Connected power supply during deinstallation
Risk of deadly electric shock or severe injuries due to live components.
•
The hot runner components and the mould have to be disconnected from the voltage source during deins-
tallation.
WARNING!
PPE
Hot surfaces / hot material (plastic melt)
Body burns by hot surfaces.
•
Let the HPS III hot runner system and all components cool down completely to
ambient temperature before starting maintenance work / disassembling. Never
touch material leaking from the nozzle/the mould/the hot runner or the material
inlet. Even material that seems to be cooled down already may still be hot inside
the core and cause burns.
•
Please make sure you wear your personal protective equipment (PPE)
Escape of hydraulic liquid and pressurised air
Risk of injuries.
•
All hydraulic or pneumatic supply lines must be depressurised.
8.1 Safety instructions
Summary of Contents for HPS III
Page 2: ......
Page 116: ...116 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN...
Page 122: ...122 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...
Page 126: ...126 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...