43
HPS-III-Nadelverschluss-Heißkanalsystem_Montage_BA_V-2-0_EN
Installation of HPS III valve gate hot runner systems
Installation of valve gate systems with individual drive units for HPS III-S nozzles for standard and front
installation
Pos. 1 Manifold
Pos. 6 Locating ring
Pos. 7 Drive unit integrated in clamping plate (version 1)
Pos. 8 Drive unit integrated in clamping plate (version 2)
Pos. 9 Drive unit placed on manifold (coupled)
Pos. 10 Drive unit placed on manifold (screwed-on)
(version 1)
Pos. 11 Electric drive unit
Pos. 14 Drive unit placed on manifold (screwed-on)
(version 2)
Pos. 50 Insulating plate
Pos. 51 Clamping plate
Pos. 53 Nozzle retainer frame plate
Pos. 56 Contour plate
Read operating manual
In the installation process described in the following hazards for the
personal health are listed explicitly.
Furthermore, during installation the warning, safety and installation
notes for installation of EWIKON hot runner systems and compo-
nents as specified in chapter „5.2 General safety instructions“ must
be followed!
NOTE!
Dimensional check
Before installation the installation dimensions as listed in chapter
„5.4 Checks before installation“ must be checked and compared with
the values provided with the installation drawing.
Use approved standard parts only
Only standard parts which are approved for use in EWIKON hot
runner systems must be used. See chapter „5.3 Technical Requi-
rements“.
Screw connection for manifold
The screw connection for the manifold (pos. 13) is only required
when nozzles for standard installation are used.
When nozzles for
front installation are installed the manifold must not be screw
connected.
NOTE!
Summary of Contents for HPS III
Page 2: ......
Page 116: ...116 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN...
Page 122: ...122 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...
Page 126: ...126 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...