91
HPS-III-Heißkanalsystem_Elektro-System_BA_V-2-0_EN
Wiring order (Example: 6-drop system):
The control zones are numbered consecutively, beginning at the position of the first nozzle (top left). Each control zone has a
heater and a thermocouple assigned. First all nozzles (H-01 - H-06) should be wired, then all manifold heaters (M-01 - M-02)
and at last the heater of the connecting nozzle (CN-01). The contact allocation follows DIN 16765, part A.
Detailed wiring instructions for standard system configurations are shown on the following pages.
z218-09
Cable colour: black + / white - (type J)
Option: green + / white - (type K)
Cable colour: green-yellow
Cable colour: brown (L)
Cable colour: brown (L)
Cable colour:
blue (N)
Cable colour:
blue (N)
Key to the symbols
Z
Control zone
H
Heater nozzle
M
Heater manifold
CN
Heater band sprue bush
T
Thermocouple
PE
Protective earth conductor
L
Phase conductor
N
Neutral conductor
Control zone Z
230 V
Thermo
Z-01
H-01
T-01
Z-02
H-02
T-02
Z-03
H-03
T-03
Z-04
H-04
T-04
Z-05
H-05
T-05
Z-06
H-06
T-06
Z-07
M-01
T-07
Z-08
M-02
T-08
Z-09
CN-01
T-09
Picture 62: Wiring order (example: 6-drop system)
Electrical connection of hot runner systems
Summary of Contents for HPS III
Page 2: ......
Page 116: ...116 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN...
Page 122: ...122 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...
Page 126: ...126 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...