10
1.2 Installation
This instrument is intended for indoor use in a pollution degree 2 environment. Please refer to the
specifications table for the allowable environment operating limits.
Figure 1.6 E-Load outline diagram (unit mm)
There are 2 cabinet mounting holes on the both sides of the E-load. After removing the gap, it can be
used for cabinet installation and positioning.
1.3 Plug in Power Cord
Connect an appropriate IEC power cord to the DC Load and plug the power cord into an AC power
outlet. Please find the following power cord type in different countries and areas.
Ensure that the line voltage selector switch on the back panel is set to match your line voltage. Failure
to do so could result in damage to the instrument.
Figure 1.7
4 types of power cord for different countries and area
ET System electronic GmbH