4. MOUNTING
The process described in this information shall be carried out by technicians which are attested by gas approval bodies, duly
certified, authorized and experts in the field as well as by authorized companies-services-installers. The end user shall strictly not
carry out these operations. If the product will not be installed properly; incorrect or non-operation of the product or failures can
lead to loss of property, injury and loss of life. Our company will not be held responsible for applications carried out without
observing the manual.
Correctly determine and be sure of the characteristics of the product to be used before installation. Check the technical and
general information on the product and in this manual, compare it and make sure that the correct selection is made, especially
review the information on the label because it symbolizes the product itself. In case of any discrepancies between the information,
please contact the manufacturer without carrying out any operation.
A. BEFORE MOUNTING
Check auxiliary parts (gasket, seal, protection plug etc.) which may be on or in the product and the box, as well as the
documentation (manual, warning, label, certificate etc.) which have to be available with the product. In case of deficiencies or
failures please contact the manufacturer without carrying out any operation.
Make the necessary verifications and ensure that the comparisons to verify that the product to be mounted is in compliance with
the line specifications to be installed have been made (operating pressure range, fluid, flowrate, environmental conditions,
cleanness of the line and fluid, selection of the interconnectivity types and diameters, axis eccentricity in the line, appropriate line
and product dimensions etc.). In particular, the label on the product should be checked carefully and its suitability for operation
shall be confirmed.
Check and make sure that the inlet and outlet pipelines are aligned. In case of wet gases, necessary actions should be taken to prevent
water ingress and potential subsequent freezing. Confirm that the installation has been started in accordance with applicable technical
rules and laws. An inlet and outlet shut-off valve has to be mounted in the line which the product will be installed, being one each before
and after the product. To ensure protection against any pipe leakage, install manual gas shut-off devices (e.g. sphering valves etc.) in