EU DECLARATION OF CONFORMITY 

AB UYGUNLUK BEYANI

 

According to Pressure Equipment Directive (2014/68/EU) 

Basınçlı Ekipmanlar Yönetmeliği’ne Göre (2014/68/AB)

 

Declaration Number 
(Deklarasyon No) 

 

DEC_003_R00 

Manufacturer and Owner Of Certificate 
(Üretici ve Sertifika Sahibi Adı) 

 

ESKA VALVE A.Ş. 

Trade Mark 
(Ticari Marka) 

 

ESKA VALVE / ESKA 

Manufacturer Adress and Place 
(Üretici Adresi ve Üretici Yeri) 

 

Sakarya 1. Organize Sanayi Bölgesi Mahallesi, 11. Cadde, No:6-8, 
Arifiye/Sakarya/Türkiye 

Product Description 
(Ürün Tanımı) 

 

Gas Pressure Regulator Without Safety Shutoff Valve

  

Emniyet Kapatmasız Gaz Basınç Regülatörü

 

Product Model / Type / Serie 
(Ürün Modeli / Tipi / Seri) 

 

ERG-HZ5 Series and Versions ( LP,MP,HP ) 

ERG-HZ5 Serisi ve Versiyonları ( LP,MP,HP )

 

Product Information  
(Ürün Bilgileri)
 

PS4, PS6, PS10, PS16, PS20, TS: Class 1 (-10;60°C) or Class2 (-20;60°C) on 
request with (-40;60°C), DN25xDN25 Threaded Connection (on request with 
modular connection), AC 5/10/20, SG 10/20/30, PS4 and PS6 IS Type , PS10,PS16 
and PS20 DS Type ( PSD:8 ) 

 

PS4, PS6, PS10, PS16, PS20,  TS: Sınıf 1 (-10;60°C) yada Sınıf 2 (-20;60°C) ( istek üzerine -
40;60°C), DN25xDN25 Dişli Bağlantı (istek üzerine modüler bağlantı), AC 5/10/20, SG 
10/20/30, PS4 ve PS6 IS Tip, PS10,PS16 ve PS20 DS Tip ( PSD8 ) 

 

 

Declaration Issue Date 
(Deklarasyon Yayın Tarihi) 

 

01.11.2020 

 

 

EU Conformity Assessment Method 
(AB Uygunluk Değerlendirme Yöntemi)
 

 

2014/68/EU PED, Sound Engineering Practice ( SEP ) 

 

 

Declaration  
(Deklarasyon)
 

We  declare  that  our  products  with  a  serial  number  as  defined  above  meet  the  requirements 
2014/68/EU  PED-  Pressure  Equipment  Directive  Article  4  item  3  .  These  equipments  designed 
and manufactured in accordance with the sound engineering practice (SEP) of a Member State in 
order to ensure safe use. However, These equipments should not bear the CE mark in accordance 
with Article 4 item 3. 

Yukarı  da  tanımlanan  üzerinde  seri  no  olan  ürünlerimizin,    2014/68/AB-Basinçli  Ekipmanlar 
Direktifi  Madde  7  (3)  uyarınca  güvenli  kullanımı  sağlamak  için  geçerli  genel  kabul  görmüş 
mühendislik uygulamasına (SEP) uygun olarak tasarımlanmış ve imal edilmiştir. Bununla birlikte 
2014/68/AB-Basinçli  Ekipmanlar  Direktifi    Madde  7  (3)  gereği  bu  ekipmanlara  CE  işareti 
taşımaması gerektiğini beyan ederiz. 

 

Note 
(Not)
 

The compliance with Directives applies only to the product if the product is integrated in a system 
or combined with other units .The system manufacturer is responsible fort he compliance of the 
complete system with Directives. By altering the device without approval the declaration would 
invalidate. 

 

Ürünün bir sistemle entegre olarak ya da diğer bir birimle birleştirilerek kullanıldığı durumlarda 
direktiflerle  uyumluluk  yalnızca  ürünü  kapsar.  Sistem  üreticisi  sistemin  tamamının  direktiflere 
uyumluluğundan  sorumludur.  Onayımız  alınmadan  cihaz  üzerinde  değişiklik  yapıldığında  bu 
beyan geçerli değildir.

   

 

 
 
 
 
 
 
 
 
 
 
 

 

Manufacturers Authorized Signature 

(Üretici İmza Yetkilisi)

 

Erhan SARDAL 
General Manager 

(Genel Müdür)

 

Sakarya/Türkiye, 01.11.2020 
 
 
 

 
 
 

 

 

 

Summary of Contents for ERG-H5

Page 1: ...sactions Save for Future Requirements Products must only be authorized by authorized persons This product must be installed in accordance with applicable rules and guidelines ESKA VALVE A Sakarya 1 Or...

Page 2: ...plement the right systems to protect the product Taking into considerations the factors such as tampering the product unauthorized opening of the product covers inserting wires water dirt etc and othe...

Page 3: ...DEFINITIONS AND ABBREVIATIONS Device or Product ESKA Brand Gas Pressure Regulator SSD Automatic Safety Shut Off Device Authorized Body Gas distribution company existing in the province or region wher...

Page 4: ...te of 200 m3 h and input pressure below 5 bar in connections with input from above through inside gas consumption devices which are placed after gas meters used in homes and similar places Permissible...

Page 5: ...sed as a backup inspection device and is spring driven The ERG H5 Model gas pressure regulator has a high and or low pressure gas safety shut off device that is built in the same body i e placed in an...

Page 6: ...in the product and the box as well as the documentation manual warning label certificate etc which have to be available with the product In case of deficiencies or failures please contact the manufact...

Page 7: ...shall be higher than the outlet pressure Ensure that there are no diameter narrowing and expansion over short distances at the inlet and outlet of the line on which the product will be mounted Before...

Page 8: ...s use a gland or ball valves at the product inlet and outlet Connect the product to the line without causing mechanical stress It should be remembered that excessive loads to be applied to the body ma...

Page 9: ...roduct is not reverse mounted After the product is assembled carry out the necessary checks Ensure that the product impermeability is provided example external impermeability visual control Gas Inlet...

Page 10: ...leased gas is mixed in the atmosphere if the product is equipped with a discharge system and check that outlet and gas impermeability is achieved by appropriate methods foam detector etc 7 Wait until...

Page 11: ...anizations should be contacted immediately If the product is closed for various reasons during operation the inlet and outlet valve should be closed the problem should be detected and the product shal...

Page 12: ...struction 8 Monitor the output pressure from the manometer and bring it to the set value and make sure that the slam shut remains installed at the desired value OUTER LEAKAGE TEST 1 Set the inlet pres...

Page 13: ...ssure increase is achieved in clockwise rotations and pressure decrease in reverse rotations 6 If there is an SSD an increase in safety pressures should be ensured when adjusted output pressures are i...

Page 14: ...been exceeded All aforementioned tests should be repeated and it shall be ensured that the results are in conformity It is recommended to seal the adjustment devices so that the settings are not chan...

Page 15: ...n 2 Cleaning and protection of the pipeline before the product in general after commissioning maintenance may be required very often since the pipeline is not clean enough 3 The level of reliability r...

Page 16: ...spring supplied from the manufacturer properly and without forcing 4 Place the H1 TEMPER NUT No 9 with the appropriate hexagonal wrench to its initial position 5 Manually assemble the SR UPPER COVER P...

Page 17: ...duct In all cases make sure that nobody is present indoors in any situation which leads to gas release from the product or the line to the atmosphere that no hazardous atmosphere is and or will be for...

Page 18: ...nsions are in mm Figure 9 Regulation Discharge No 1 G1 4 ISO 228 SSD Discharge No 2 G1 8 ISO 228 SSD Sensing Line No 3 GE12 1 4 For Pipes 12 X 1 5 Regulation Sensing Line No 4 GE12 1 4 For Pipes 12 X...

Page 19: ...Page 19 of 32 Figure 11...

Page 20: ...Page 20 of 32...

Page 21: ...5 C 1013 mbar Q n m h natural gas x K Q n m h x gas Example Q n m h natural gas x 0 78 Q n m h air Correction factor K at 15 C Butane 0 55 Propane 0 64 Oxygen 0 76 Air 0 78 Nitrogen 0 81 Biogas 0 85 C...

Page 22: ...ight to make changes in the spring settings Please contact the spring manufacturer Internal Sensing Active Internal and External Sensing Active Pd Outlet Pressure bar Maximum Capacities m3 h Natural G...

Page 23: ...not lift during transportation In case of repacking no humidity or wetness shall remain in the product The product shall be stored in environments which are isolated from forces such as falling tippin...

Page 24: ...g to the type of problem if you do not prefer to carry out these procedures or if you have despite the performance of such procedures not solved the problem or have not remedied the suspicion of a pro...

Page 25: ...odel The dimensions of the gas line may be incorrect Increase the nominal width of the pipeline The gas filter before the regulator may be contaminated Carry out maintenance on the gas filter replace...

Page 26: ...ealed do not perform this process The product line connection may not be fully connected If there is a leak in the outlet connection nozzle remove the product from the line remove the outlet seal manu...

Page 27: ...s which may cause combustion cigarettes lighters matches etc extinguish all open fires and smoky substances sources that may create sparks and fires do not re start Do not touch turn on or off any ele...

Page 28: ...rihi 01 11 2020 The name of the Notified Body and No Onaylanm Kurulu un Ad ve Numaras T V NORD System GmbH Co KG 0045 EU Conformity Assessment Method AB Uygunluk De erlendirme Y ntemi 2014 68 EU PED C...

Page 29: ...name of the Notified Body and No Onaylanm Kurulu un Ad ve Numaras T V NORD System GmbH Co KG 0045 EU Conformity Assessment Method AB Uygunluk De erlendirme Y ntemi 2014 68 EU PED Category I Modul A2 M...

Page 30: ...gineering Practice SEP Declaration Deklarasyon We declare that our products with a serial number as defined above meet the requirements 2014 68 EU PED Pressure Equipment Directive Article 4 item 3 The...

Page 31: ...4 84 E mail info eskavalve com Authorized Signature Authorized Stamp THE SELLER S Title Address Phone Fax E mail Authorized Signature Authorized Stamp COMMODITYS S Type Gas Pressure Regulator Brand ES...

Page 32: ...ing free repairs and in cases where the goods have failed again within the warranty period the maximum period for repair has been exceeded it has been identified by the authorized service station sell...

Reviews: