7. PERIODICAL MAINTENANCE AND INSPECTION 

A. BEFORE 

Periodic maintenance-inspection is recommended for the intact and safe operation of the product.  

For all operations, full compliance with the rules in this manual must be ensured. This manual should always be with you before, during 
and  after periodic  maintenance-inspection  and  all rules  in  this manual should  be  followed.  If you  think  there  is  any  incomplete and 
incorrect information, contact the manufacturer and do not carry out any further operation. 

No  repairs  on  the  product  should  be  carried  out  by  the  user. All  repair  operations  should  be  carried  out  by  authorized  services  and 
personnel. Users or non-authorized persons should not intervene in the product or in the line in case of any malfunction. The parts that 
may needed to be disassembled for repair in the product can be removed and installed with normal hand tools and are formed sin such 
way that they are not installed incorrectly. To prevent personal injuries or damage to equipment, do not perform any maintenance or 
disassembly without separating the product from the system pressure and draining all internal pressure, as described in the "Shut-Off" 
section.  It  is  important  to ensure that the product  is  isolated  from  the  inlet  and  outlet  pressure  and that  the  pressure  between  the 
product and outlet valve section of the line has been discharged. Prevent explosive gas-air mixture: constantly control the air of the room 
for gas leakage with a suitable gas concentration measurement device. 

The plant shall be equipped with discharge devices and systems to discharge the pressure and fluid from the plant before any inspection 
and maintenance operations. 

The maintenance process is closely associated with the quality of transporting of gas (particles, humidity, gasoline, corrosive substances) 
and the efficiency of filtering. 

In any case, make sure that there is no pressurized gas in the product before performing any maintenance operation. 

The periodic maintenance-inspection intervals should not exceed the intervals specified by the gas organization or the related legislation. 
The maintenance time shall be adjusted according to the working conditions. 
If not determined by rules, the time period of preventive maintenance depends on the following conditions: 
1- The quality of gas transportation  
2- Cleaning and protection of the pipeline before the product: in general, after commissioning, maintenance may be required very 
often, since the pipeline is not clean enough.  
3- The level of reliability required by the regulatory system 

Perform maintenance 

of the product’s parts 

with an "EITHER CLEAN OR REPLACE" approach. 

B. DURING 

In  any  case,  do  not  apply  abrupt  discharge  to  clean  the  line  after  the  product  or  to  carry  out  maintenance-repair  operations  on  the 
product.  

Disassemble the product from the line in accordance with the disassembly rules specified in this manual. Before starting the process, 
ensure that  the gas  in  front  of  and  behind  the  product  is  turned  off.  Make  sure  that  the fasteners (screws  and/or  bolts-nuts)  in  the 
product are screwed and unscrewed with the specified torques. For this purpose, use a calibrated device and keep it with you. Install the 
covers exactly  in  the  same  place  again  using the  same screws, without  applying  any  contraction  and  straining  on  the screws and  by 
reciprocal tightening without applying excessive force so that the holes overlap completely and make sure that they do not remain loose 
and are not exposed to any mechanical damage. If there is any paint-lacquer etc. on the fasteners, do not perform any process and 
contact the manufacturer first. 

If necessary, do not disassemble the parts inside the enclosures which you have removed separately, hold the enclosures as a group with 
the parts inside clean them slowly with a clean cloth. 

If a problem will be identified during the periodic maintenance and inspection, necessary actions shall be taken according to the rules 
described in the failures chapter. 

Maintenance  intervals  depend  on system-specific  operating  and ambient  conditions, gas  quality,  the  condition  of  pipelines,  etc.  The 
maintenance intervals should be determined by the operator of the system in a system-specific manner. The inspection/control and 
replacement  frequencies  depend  on  the  severity  of  the  terms  of  service  and  applicable  national  laws,  regulations,  standards  and 
directive/recommendations. We recommend function control on a monthly basis and maintenance on an annual basis to ensure that the 
system shall remain operative. At worst, function control on an annual basis and maintenance on a biennially basis may be preferred. 
The pressure equipment directive (PED) and the energy performance of buildings directive (EPBD) stipulate a regular control of heat 
generators to ensure high efficiency and therefore low emissions to the environment in long terms. 

 

 

Summary of Contents for ERG-H5

Page 1: ...sactions Save for Future Requirements Products must only be authorized by authorized persons This product must be installed in accordance with applicable rules and guidelines ESKA VALVE A Sakarya 1 Or...

Page 2: ...plement the right systems to protect the product Taking into considerations the factors such as tampering the product unauthorized opening of the product covers inserting wires water dirt etc and othe...

Page 3: ...DEFINITIONS AND ABBREVIATIONS Device or Product ESKA Brand Gas Pressure Regulator SSD Automatic Safety Shut Off Device Authorized Body Gas distribution company existing in the province or region wher...

Page 4: ...te of 200 m3 h and input pressure below 5 bar in connections with input from above through inside gas consumption devices which are placed after gas meters used in homes and similar places Permissible...

Page 5: ...sed as a backup inspection device and is spring driven The ERG H5 Model gas pressure regulator has a high and or low pressure gas safety shut off device that is built in the same body i e placed in an...

Page 6: ...in the product and the box as well as the documentation manual warning label certificate etc which have to be available with the product In case of deficiencies or failures please contact the manufact...

Page 7: ...shall be higher than the outlet pressure Ensure that there are no diameter narrowing and expansion over short distances at the inlet and outlet of the line on which the product will be mounted Before...

Page 8: ...s use a gland or ball valves at the product inlet and outlet Connect the product to the line without causing mechanical stress It should be remembered that excessive loads to be applied to the body ma...

Page 9: ...roduct is not reverse mounted After the product is assembled carry out the necessary checks Ensure that the product impermeability is provided example external impermeability visual control Gas Inlet...

Page 10: ...leased gas is mixed in the atmosphere if the product is equipped with a discharge system and check that outlet and gas impermeability is achieved by appropriate methods foam detector etc 7 Wait until...

Page 11: ...anizations should be contacted immediately If the product is closed for various reasons during operation the inlet and outlet valve should be closed the problem should be detected and the product shal...

Page 12: ...struction 8 Monitor the output pressure from the manometer and bring it to the set value and make sure that the slam shut remains installed at the desired value OUTER LEAKAGE TEST 1 Set the inlet pres...

Page 13: ...ssure increase is achieved in clockwise rotations and pressure decrease in reverse rotations 6 If there is an SSD an increase in safety pressures should be ensured when adjusted output pressures are i...

Page 14: ...been exceeded All aforementioned tests should be repeated and it shall be ensured that the results are in conformity It is recommended to seal the adjustment devices so that the settings are not chan...

Page 15: ...n 2 Cleaning and protection of the pipeline before the product in general after commissioning maintenance may be required very often since the pipeline is not clean enough 3 The level of reliability r...

Page 16: ...spring supplied from the manufacturer properly and without forcing 4 Place the H1 TEMPER NUT No 9 with the appropriate hexagonal wrench to its initial position 5 Manually assemble the SR UPPER COVER P...

Page 17: ...duct In all cases make sure that nobody is present indoors in any situation which leads to gas release from the product or the line to the atmosphere that no hazardous atmosphere is and or will be for...

Page 18: ...nsions are in mm Figure 9 Regulation Discharge No 1 G1 4 ISO 228 SSD Discharge No 2 G1 8 ISO 228 SSD Sensing Line No 3 GE12 1 4 For Pipes 12 X 1 5 Regulation Sensing Line No 4 GE12 1 4 For Pipes 12 X...

Page 19: ...Page 19 of 32 Figure 11...

Page 20: ...Page 20 of 32...

Page 21: ...5 C 1013 mbar Q n m h natural gas x K Q n m h x gas Example Q n m h natural gas x 0 78 Q n m h air Correction factor K at 15 C Butane 0 55 Propane 0 64 Oxygen 0 76 Air 0 78 Nitrogen 0 81 Biogas 0 85 C...

Page 22: ...ight to make changes in the spring settings Please contact the spring manufacturer Internal Sensing Active Internal and External Sensing Active Pd Outlet Pressure bar Maximum Capacities m3 h Natural G...

Page 23: ...not lift during transportation In case of repacking no humidity or wetness shall remain in the product The product shall be stored in environments which are isolated from forces such as falling tippin...

Page 24: ...g to the type of problem if you do not prefer to carry out these procedures or if you have despite the performance of such procedures not solved the problem or have not remedied the suspicion of a pro...

Page 25: ...odel The dimensions of the gas line may be incorrect Increase the nominal width of the pipeline The gas filter before the regulator may be contaminated Carry out maintenance on the gas filter replace...

Page 26: ...ealed do not perform this process The product line connection may not be fully connected If there is a leak in the outlet connection nozzle remove the product from the line remove the outlet seal manu...

Page 27: ...s which may cause combustion cigarettes lighters matches etc extinguish all open fires and smoky substances sources that may create sparks and fires do not re start Do not touch turn on or off any ele...

Page 28: ...rihi 01 11 2020 The name of the Notified Body and No Onaylanm Kurulu un Ad ve Numaras T V NORD System GmbH Co KG 0045 EU Conformity Assessment Method AB Uygunluk De erlendirme Y ntemi 2014 68 EU PED C...

Page 29: ...name of the Notified Body and No Onaylanm Kurulu un Ad ve Numaras T V NORD System GmbH Co KG 0045 EU Conformity Assessment Method AB Uygunluk De erlendirme Y ntemi 2014 68 EU PED Category I Modul A2 M...

Page 30: ...gineering Practice SEP Declaration Deklarasyon We declare that our products with a serial number as defined above meet the requirements 2014 68 EU PED Pressure Equipment Directive Article 4 item 3 The...

Page 31: ...4 84 E mail info eskavalve com Authorized Signature Authorized Stamp THE SELLER S Title Address Phone Fax E mail Authorized Signature Authorized Stamp COMMODITYS S Type Gas Pressure Regulator Brand ES...

Page 32: ...ing free repairs and in cases where the goods have failed again within the warranty period the maximum period for repair has been exceeded it has been identified by the authorized service station sell...

Reviews: