SC-F2000
Revision C
DISASSEMBLY & ASSEMBLY
Disassembly and Assembly Procedure
170
Confidential
When installing the PG SWITCH LEVER ASSY, confirm the
following.
Install the Fasten Shaft so that the D-cut side of the Fasten
Shaft comes to the front side.
When installing the Fasten Shaft, align the screw hole of the
Tray Arm with that of the Fasten Shaft.
Align the protrusion of the PG Assy Flange with the hole of the
Tray Arm.
Fasten Shaft
Tray Arm
Screw Holes
D-cut side
Try Arm
PG Assy Flange
Hole
Protrusion
Install the HEIGHT ADJUSTMENT LEVER so that its handle
comes to the right side.
Lubrication
Lubrication
When replaced with a new part, make sure to lubricate the new one
referring to
.
Handle
HEIGHT ADJUSTMENT
LEVER
Summary of Contents for SC-F2000 Series
Page 1: ...SC F2000 Direct To Garment Printer SERVICE MANUAL SECP13002 Confidential ...
Page 10: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 29: ...Confidential C H A P T E R 2 TROUBLESHOOTING ...
Page 52: ...Confidential C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Page 192: ...Confidential C H A P T E R 4 ADJUSTMENT ...
Page 285: ...Confidential C H A P T E R 5 MAINTENANCE ...