
Maintenance 10. Greasing and Replacing the Ball Screw Spline Unit
E2C Rev.6
173
Installation
(1) Fit the U2 and Z belts onto the shaft, and
then place the ball screw spline unit into
the Arm #2.
Z belt
U2 belt
(2) Tighten the screws for the ball screw spline
shaft to the bottom of Arm #2.
Be careful not to allow the timing belt
pinched between the nut and Arm #2.
4-M4
×
10
(3) Loosely secure the spline plate to Arm #2.
After moving the shaft up and down
several times, secure the spline plate to
Arm #2.
U2 belt
Spline
plate
3-M4
×
12
+Washer
(Small)
Summary of Contents for E2C Series
Page 1: ...SCARA ROBOT E2C series MANIPULATOR MANUAL Rev 6 EM069R1409F ...
Page 2: ...MANIPULATOR MANUAL E2C series Rev 6 ...
Page 8: ...vi E2C Rev 6 ...
Page 14: ......
Page 82: ......
Page 92: ...Maintenance 2 General Maintenance 80 E2C Rev 6 ...
Page 118: ...Maintenance 4 Replacing the Cable Unit 106 E2C Rev 6 ...
Page 194: ...Maintenance 11 Replacing the Signal Relay Board 182 E2C Rev 6 ...