A. Pack position when the timer starts.
B. Pack position when the timer stops.
4. Repeat the measurement a number of times to enure a consistent result.
5. Convert the time taken to msecs (milliseconds). One second = 1000 msecs.
6. Enter the calculated time taken in msecs on the PLC screen to set the required Pack
Length for the product being run.
7. Run the product line and monitor to confirm the setup has been calculated /
entered correctly. Adjust if required.
6.5.2
Setting the measurement start and end
The measurement start and end require more detailed configuration. Sufficient time
MUST
be taken to ensure that all steps in the procedure below have been completed.
Procedure
1. The production line
MUST
be running steadily at the required production rate to
ensure accurate measurements. If the line speed is changed the measurement will
need to be repeated and reset.
Software interface description
Reference Manual
July 2022
00809-0100-4245
68
Rosemount CT4215
Summary of Contents for Rosemount CT4215
Page 1: ...Reference Manual 00809 0100 4245 Rev AC July 2022 Rosemount CT4215 Leak Detection System ...
Page 12: ...Contents Reference Manual July 2022 00809 0100 4245 12 Rosemount CT4215 ...
Page 46: ...Start up procedure Reference Manual July 2022 00809 0100 4245 46 Rosemount CT4215 ...
Page 76: ...Software interface description Reference Manual July 2022 00809 0100 4245 76 Rosemount CT4215 ...
Page 86: ...Maintaining the leak detector Reference Manual July 2022 00809 0100 4245 86 Rosemount CT4215 ...