Power, communication and compressed air connections.
A. Mains On/Off isolator.
B. Blower motor isolator.
C. Blower status lamp indicating there is power to the blower motor.
D. Mains electrical connection point. (Customer option, factory configured for 110VAC or
230VAC.
E. Sample gas exhaust.
F. Factory compressed air in connected to the inlet on the air preparation plate.
G. Optional Compressed air out supplying an air reject system.
H. M6 Chassis earth connection.
I. Signal connection from the sample head input gate. Mating connector will be supplied
with the unit.
J. Signal connection from the sample head reject gate. Mating connector will be supplied
with the unit.
K. Status connection for customer telemetry output. connection. Mating connector will be
supplied with the unit.
L. Ethernet connection.
M. Loose mating plug for the mains electrical connection point. Customer will connect to a
suitably rated cable.
Reference Manual
Equipment and accessories
00809-0100-4245
July 2022
Reference Manual
23
Summary of Contents for Rosemount CT4215
Page 1: ...Reference Manual 00809 0100 4245 Rev AC July 2022 Rosemount CT4215 Leak Detection System ...
Page 12: ...Contents Reference Manual July 2022 00809 0100 4245 12 Rosemount CT4215 ...
Page 46: ...Start up procedure Reference Manual July 2022 00809 0100 4245 46 Rosemount CT4215 ...
Page 76: ...Software interface description Reference Manual July 2022 00809 0100 4245 76 Rosemount CT4215 ...
Page 86: ...Maintaining the leak detector Reference Manual July 2022 00809 0100 4245 86 Rosemount CT4215 ...