A. Product pack.
B. Reject mechanism.
C. Reject chute / bin.
D. Second sample measurement bar.
E. Typical pack handling device.
F. First sample measurement bar.
G. Input gate.
2. Divide the production line speed in m/s (or ft/s) by the maximum pack length in m
or (ft) to determine the time it would take for the pack to pass through the input
gate in msecs (milliseconds). One second = 1000 msecs.
A. Minimum pack length.
B. Maximum pack length.
3. Alternatively, using a stopwatch or video determine the time taken for a pack to
fully pass by the input gate. For fast moving product lines take the measurement
over a larger number of packs and divide the time recorded by the number of packs
Reference Manual
Software interface description
00809-0100-4245
July 2022
Reference Manual
67
Summary of Contents for Rosemount CT4215
Page 1: ...Reference Manual 00809 0100 4245 Rev AC July 2022 Rosemount CT4215 Leak Detection System ...
Page 12: ...Contents Reference Manual July 2022 00809 0100 4245 12 Rosemount CT4215 ...
Page 46: ...Start up procedure Reference Manual July 2022 00809 0100 4245 46 Rosemount CT4215 ...
Page 76: ...Software interface description Reference Manual July 2022 00809 0100 4245 76 Rosemount CT4215 ...
Page 86: ...Maintaining the leak detector Reference Manual July 2022 00809 0100 4245 86 Rosemount CT4215 ...