
The Smart Meter Verification functionality can be scheduled to run at defined intervals, or
it can be initiated on demand.
6.6.1
Perform smart meter verification
Procedure
1. Select
Service Tools
→
Maintenance
→
Smart Meter Verification
.
2. Under
Manual Verification
, select
Perform Verification
and follow the on-screen
instructions.
6.6.2
Schedule automatic verification
Procedure
1. Select
Service Tools
→
Maintenance
→
Smart Meter Verification
.
2. Under
Automatic Verification
, select
Schedule Verification
and follow the on-screen
instructions.
Reference Manual
Operation and maintenance
00809-0100-4418
September 2022
Rosemount 3408 Level Transmitter
53