6.
Set or configure the meter operating parameters using Daniel MeterLink. For
additional installation information refer to the system wiring diagram (see ), Daniel
MeterLink Software for Gas and Liquid Ultrasonic Meters Quick Start Manual (P/N
3-9000-763) and use the Daniel MeterLink Field Setup Wizard to complete the
configuration.
7.
Verify the field connections are working correctly. Allow the system to run for the
time specified by the customer (usually one week) and an electrician has fully tested
the connections. After the Acceptance Test is witnessed and approved, seal the
conduit.
8.
Power down the system and apply the sealing compound to the conduit and allow
to set in accordance with manufacturer specifications.
9.
If required, install the security latches and wire seals on the Transmitter Electronics
Enclosure end caps (see ).
10.
If required, install the wire seals through the socket head bolts on the Base Enclosure
(see ).
11.
Re-apply electrical power to the system.
3.4.2
Startup for systems that use flame-proof cable
WARNING!
HAZARDOUS VOLTAGE INSIDE
Do not open the Transmitter Electronics Enclosure when an explosive gas atmosphere is
present. Disconnect equipment from supply circuit before opening the enclosure.
Failure to remove power may result in serious death or injury.
Procedure
1.
Check to make certain that all field wiring power is turned OFF.
2.
Remove the end cap nearest the cable entries to gain access to the transmitter
electronics.
3.
Install the cable and cable gland.
4.
Complete the field connection wiring and apply electrical power to the system.
5.
Set or configure the meter operating parameters using Daniel MeterLink. For
additional installation information refer to the system wiring diagram (see ) , Daniel
MeterLink Software for Gas and Liquid Ultrasonic Meters Quick Start Manual (P/N
3-9000-763) and use the Daniel MeterLink Field Setup Wizard to complete the
configuration.
6.
Verify the field connections are working correctly. Allow the system to run for the
time specified by the customer (usually one week) and an electrician has fully tested
the connections. After the Acceptance Test is witnessed and approved, seal the
conduit.
7.
Power down the system and apply the sealing compound to the conduit and allow
to set in accordance with manufacturer specifications.
Electrical installation
54
Gas Ultrasonic Flow Meter
Summary of Contents for Daniel 3410 Series
Page 8: ......
Page 122: ...Engineering drawings 112 Gas Ultrasonic Flow Meter ...
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 139: ...Open source licenses Installation manual 125 ...