DOC
NUMBER
595R495
70
SERVICE MANUAL Blast Chiller Freezer 100 - 200
In the dashboard “Status” is indi-
cated the first Step
“Preparing
phase”
The “
Preparation phase
” will end
only when the temperature set in
the “
Cavity set”
is reached.
The screenshot below shows the
actual temperature of the cavity
When the “Preparation phase”
temperature is reached, the “
Test-
ing phase
” is activated.
The temperature to reached at this
stage is -30°C, is shown in the line
"T° Cavity Set".
A countdown time limit will be acti-
vated, which will determine the ef-
fective duration of the test; If the
cavity temperature is reached be-
fore the time expires, the test cy-
cle will end successfully