![Electro Industries Shark 200S Installation & Operator'S Manual Download Page 94](http://html.mh-extra.com/html/electro-industries/shark-200s/shark-200s_installation-and-operators-manual_2379717094.webp)
Doc
#
E149721
5 - 22
5: Communication Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Limits
Limits are transition points used to divide acceptable and unacceptable measure-
ments. When a value goes above or below the limit an out-of-limit condition occurs.
Once they are configured, you can view the out-of-Limits (or Alarm) conditions in the
Limits log or Limits polling screen. You can also use Limits to trigger relays. See the
Communicator EXT User Manual for details.
The current settings for Limits are shown in the screen. You can set and configure up
to eight Limits for the Shark® 200S meter.
To set up a Limit:
1. Select a Limit by double-clicking on the Assigned Channel field.
2. You will see the screen shown below. Select a Group and an Item for the Limit.
Summary of Contents for Shark 200S
Page 1: ...S h a r k 200S ...