6: Ethernet Configuration
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
When the Telnet connection is established you will see a message similar to the
example shown below.
4. To proceed to Setup Mode press
Enter
again. You will see a screen similar to the
one shown below.
5. Type the number for the group of parameters you need to modify. After the group
is selected, the individual parameters display for editing. Either:
• Enter a new parameter if a change is required.
• Press Enter to proceed to the next parameter without changing the current one.