4 - 1
4: Electrical Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
4: Electrical Installation
4.1: Considerations When Installing Meters
Installation of the Shark® 200S meter must be performed only by
qualified personnel who follow standard safety precautions during all
procedures. Those personnel should have appropriate training and
experience with high voltage devices. Appropriate safety gloves,
safety glasses and protective clothing is recommended.
WARNING! During normal operation of the Shark® 200S meter, dangerous voltages
flow through many parts of the meter, including: Terminals and any connected CTs
(Current Transformers) and PTs (Potential Transformers), all I/O Modules (Inputs and
Outputs) and their circuits. All Primary and Secondary circuits can, at times, produce
lethal voltages and currents. Avoid contact with any current-carrying surfaces.
Before performing ANY work on the meter, make sure the meter is powered
down and all connected circuits are de-energized.
Do not use the meter or any I/O Output Device for primary protection or in
an energy-limiting capacity. The meter can only be used as secondary pro-
tection.
Do not use the meter for applications where failure of the meter may cause harm or
death.
Do not use the meter for any application where there may be a risk of fire.
All meter terminals should be inaccessible after installation.
Do not apply more than the maximum voltage the meter or any attached device can
withstand. Refer to meter and/or device labels and to the Specifications for all devices
before applying voltages.
Do not HIPOT/Dielectric test any Outputs, Inputs or Communications terminals.
EIG recommends the use of Fuses for voltage leads and power supply and Shorting
Blocks to prevent hazardous voltage conditions or damage to CTs, if the meter needs
to be removed from service. CT grounding is optional, but recommended.
NOTE: The current inputs are only to be connected to external current transformers
provided by the installer. The CT's shall be Approved or Certified and rated for the cur-
rent of the meter used.