Man. NVIP3 – Rel 1.3 EN (UK)
- 36 -
Average power and PF (calculated on the basis of the integration time set. Values
can be reset as described in Sect. 4.2.3) related to the auxiliary channel.
Minimum instant values of power and PF (values can be reset as described in Sect.
4.2.3.3) related to the auxiliary channel.
Maximum instant values of power and PF (values can be reset as described in Sect.
4.2.3.3) related to the auxiliary channel.
Load peaks and relevant PF, i.e. the highest average power (calculated on the
basis of the integration time set. Values can be reset as described in Sect. 4.2.3.2)
related to the auxiliary channel.
5.2.4 - Counters Menu
The first page of this menu shows the counters of the active power
absorbed
(+kWh) in
each phase and three- or two-phase connections.
When scrolling through the pages as described in Sect. 5.1, the following pages will be
displayed.
The counters of the reactive power
absorbed
(+kVarh) in each phase and in three- or
two-phase connections.
x3”