61
b.
Plug in both the primary line wires (brown and blue that run out of the
left side of the casing wall) to the L and N connection terminal. Plug in
both secondary line wires, brown from the circuit board to connection
terminal 1 and blue from the multi-terminal plug to connection terminal
2.
c.
Plug in the flat band-cable connection from the switch circuit board to the
main circuit board in the red connecting strip.
d.
Reposition the multi-terminal plug.
e.
Position the front panel and screw in place with the two screws from
below.
f.
Replace the knob on its pin and set in zero position.
g.
Reposition the transparent coffee container on the grinder and screw in
place with the two black screws. Refill with coffee beans!
h.
Refill water container and reposition. Provisionally dip water tube into
water.
i.
Reconnect machine to mains for testing purposes and disengage the safety
switch (at the back, bottom left) with the aid of a piece of styrene, wood
or cardboard so that the machine is electrified.
j.
Caution: Now do NOT touch any parts inside the machine! Keep people
away from the machine! All connections and plugs are under 230 volt
voltage. Electric shock hazard!
k.
Switch machine on at front panel. A number of leds should be
permanently on. The leds top left and top right should now start to flash
and after approximately two minutes should likewise remain permanently
lit up.
l.
Proceed following operating instructions and, after the previously flashing
leds are likewise permanently lit up, deliver both water and steam to the
wand and hot water to the brewing station.
m.
During all processes, check again that all water connections which have
been loosened during this repair are >>tight<<. Should a problem be
found, immediately engage the safety switch and disconnect machine from
mains supply. Look into problem.
Summary of Contents for SUPREME DED400XP1
Page 1: ...EXPRESSO DED400XP1 ...