PRODUCT MAINTENANCE
09/2020
45
NP-DK50 2x4VR 110-AD-A-1_09-2020
18.8. Procedure for connecting a compressor disconnected from the cabinet
Prior to any maintenance or repair work, switch off the compressor and
disconnect it from the mains (pull out the mains plug).
The compressor (without cabinet) requires that the jumper is always mounted in the terminal strip
for correct operation (Fig. 24 pos. D). It then replaces the switch on the cabinet.
If there is no jumper in the terminal strip of the compressor (disconnected from
the cabinet), the compressor will not work!
If the cord between the compressor and the cabinet becomes disconnected (by pulling the mains
plug) and the compressor is removed from the cabinet, the compressor will not be functional. This
is why it is necessary to first create a connection to the terminal strip with a jumper (replacing the
circuit breaker function) (Fig. 24 pos. A).
PROCESS:
Jumper installation (A-B-C-D process)
Disconnect the product from the mains by pulling the plug out of the socket.
Remove the cover on the electrical panel (on the compressor).
The jumper is not in the terminal strip
– A.
Lift up the fuse cover
– B.
Insert the jumper into the terminal strip
– C.
Close the fuse cover
– D.
Reinstall the cover on the electrical panel.
Connect the device to the electrical mains.
Activate the compressor by turning on the switch on the pressure switch.
Fig. 24: DK50 2x4VR/110
B
Summary of Contents for DK50 2x4VR/110/M
Page 1: ...DK50 2x4VR 110 User manual Benutzerhandbuch N vod na pou itie...
Page 2: ......
Page 4: ...CONTENTS 4 INHALT 57 OBSAH 111...
Page 14: ...PRODUCT DESCRIPTION NP DK50 2x4VR 110 AD A 1_09 2020 14 09 2020 Fig 2 Adsorption dryer...
Page 15: ...PRODUCT DESCRIPTION 09 2020 15 NP DK50 2x4VR 110 AD A 1_09 2020 Fig 3 Cabinet...
Page 66: ...PRODUKTBESCHREIBUNG NP DK50 2x4VR 110 AD A 1_09 2020 66 09 2020 Abb 2 Adsorptionstrockner...
Page 67: ...PRODUKTBESCHREIBUNG 09 2020 67 NP DK50 2x4VR 110 AD A 1_09 2020 Abb 3 Geh use...
Page 120: ...POPIS V ROBKU NP DK50 2x4VR 110 AD A 1_09 2020 120 09 2020 Obr 2 Adsorp n su i...
Page 121: ...POPIS V ROBKU 09 2020 121 NP DK50 2x4VR 110 AD A 1_09 2020 Obr 3 Skrinka...
Page 166: ......
Page 167: ......