INSTALLATION
NP-DK50 2x4VR 110-AD-A-1_09-2020
26
09/2020
11.3. Connecting the cabinet pressure gauge to the compressor
Remove the plug (1) from the threads
(2) on the pneumatic block of the
compressor
Connect the cabinet pressure gauge
hose to the threaded fitting
Fig. 15: Connecting the cabinet pressure gauge to the compressor
11.4. Routing hoses and electrical cables in cabinet-mounted compressors
Route the hose and electrical cables through the opening in the rear wall of the cabinet for
compressor models with a dryer.
Risk of damage to pneumatic components.
Air hoses must not be broken.
12. ELECTRICAL CONNECTION
The product is delivered with a cord equipped with a plug with earthing pin.
With cabinet-mounted compressors, route the power cord through the opening in the back wall
of the cabinet.
Keep the socket easily accessible to ensure that the device can be safely disconnected from the
mains.
Connection to the power distribution cabinet must be max.16 A
Risk of electric shock.
It is necessary to follow all local electro technical regulations. The mains voltage
and frequency must comply with the data stated on the device label.
Risk of fire and electric shock.
Electrical cord must not be broken.
Connecting the control harness and power cord from the compressor
Connect the control harness and power
cord from the compressor to the dryer
socket (1).
Summary of Contents for DK50 2x4VR/110/M
Page 1: ...DK50 2x4VR 110 User manual Benutzerhandbuch N vod na pou itie...
Page 2: ......
Page 4: ...CONTENTS 4 INHALT 57 OBSAH 111...
Page 14: ...PRODUCT DESCRIPTION NP DK50 2x4VR 110 AD A 1_09 2020 14 09 2020 Fig 2 Adsorption dryer...
Page 15: ...PRODUCT DESCRIPTION 09 2020 15 NP DK50 2x4VR 110 AD A 1_09 2020 Fig 3 Cabinet...
Page 66: ...PRODUKTBESCHREIBUNG NP DK50 2x4VR 110 AD A 1_09 2020 66 09 2020 Abb 2 Adsorptionstrockner...
Page 67: ...PRODUKTBESCHREIBUNG 09 2020 67 NP DK50 2x4VR 110 AD A 1_09 2020 Abb 3 Geh use...
Page 120: ...POPIS V ROBKU NP DK50 2x4VR 110 AD A 1_09 2020 120 09 2020 Obr 2 Adsorp n su i...
Page 121: ...POPIS V ROBKU 09 2020 121 NP DK50 2x4VR 110 AD A 1_09 2020 Obr 3 Skrinka...
Page 166: ......
Page 167: ......