Check the signal of the M2M.
Solid Blue means that signal is good
Note: This should be solid blue not flashing
Please tick when this step is completed:
If solid blue signal cannot be obtained, re-check the
signal strength of the VODAFONE to the installed
site. If signal is still low on Vodafone signal coverage
map, consult Edge Electrons for possible solution.
C.8
Turn-on all circuit breakers at the main.
Note: Only the use circuit breaker should be
turned-on.
Please tick when this step is completed:
D
Activating customer monitoring
D.1
1. Go to
www.edgeconx.com/installer-hub
2. Register to become an installer
3. Download the edgeConnected™ Installer App
on your smart phone or tablet (available for
Apple & Android)
4. The edgeConnected™ Installer App guides
you through the steps of installation and
customer onboarding
5. After completing the commissioning process
through the Installer App, confirm with the
customer that they have received an
activation email.
Please tick when this step is completed:
D.2
The customer should receive an email from
to activate their account.
.
Please tick when this step is completed:
G
Operational testing – Confirmation of voltage regulation
G.1
With the status LED green, measure the voltage
between
active
and
neutral
on the Edge IQ
output, confirm that the output voltage is reading
230V
Please confirm Active to Neutral voltage on the
Edge IQ output terminals is 230v: