The screw holding the cable of line and neutral
has been correctly torque. (torque setting:
20.4Kgf.cm minimum
)
Note: Both the input and output of the EdgeIQ must
have an earth connected (at the same potential)
A.6
M2M modem should be connected to the correct
port as shown on sticker in unit
Please tick when this step is completed:
Yes
Note: Port for the M2M modem (dongle) is the back
left, closest to the middle of the unit
A.7
External comms antenna connected has been
connected properly to M2M modem
Please tick when this step is completed:
Yes
Ensure locking nut of the antenna cable and the
rubber seal washer are correctly installed
A.8
Confirm that the CT is clamped to the line wire of
the solar inverter line cable?
Please tick when this step is completed:
Yes
Ensure the CT direction is correct and cable
insulation is undamaged. (Arrow is in the direction of
current flow)
B
Electrical testing
21
E D G E I Q H A N D B O O K
8.
A P P E N D I X B : C O M M I S S I O N I N G C H E C K L I S T
Item
Checklist
A
Visual inspection
A.1
Ensure power is
NOT
connected to the EdgeIQ
unit.
EdgeIQ will be connected in series from the main
switch circuit breaker to the installation load
Please confirm:
ALL energy sources have been safely ISOLATED
from the EdgeIQ device
A.2
Cables from the main switch board to EdgeIQ unit
correctly marked and terminated at both ends.
Ensure cables are correctly supported,
mechanically protected with insulation intact with
glands and lugs tightened.
Please confirm:
A.3
Cables from the EdgeIQ unit going back to the
main switch board correctly marked and
terminated at both ends.
Ensure cables are correctly supported,
mechanically protected with insulation intact with
glands and lugs tightened.
Please confirm:
A.4
The line, neutral and earth wire from the main
switch board are connected properly to the
EdgeIQ unit?
The screw holding the cable of line and neutral
has been correctly torque. (torque setting:
20.4Kgf.cm minimum)
Please confirm:
Yes
Note: Both the input and output of the EdgeIQ must
have an earth connected (at the same potential)
Note: All neutral wiring corresponds to the size of the
active conductor
A.5
The line, neutral and earth wire from the output of
the EdgeIQ are properly connected to the
connection on the main switch board load side?
Please confirm:
Yes
Summary of Contents for EDGEIQ EE-202-0050
Page 1: ...1 2 3 INSTALL THE WORLD S BEST VOLTAGE OPTIMISATION TECHNOLOGY ...
Page 2: ......
Page 31: ......