5.4. Power connection to main switchboard
A. Ensure the
main isolator is OFF to completely isolate the EdgeIQ Unit.
Important:
Each
incoming power supply, along with any additional grid tie/solar power/battery and
any
other
embedded generator source on the electrical installation
MUST
each be safely
isolated
before commencing
the electrical wiring work
B. Replicate the connection per the wiring diagram relevant to your installation. See Wiring Diagram
4 or Wiring Diagram 5 in section 4.1 and 4.2 below. Your relevant wiring diagram is based on
whether your site has or does not have solar.
C. Locate the supply main switch (must be circuit breaker style) in the switchboard. Use the power
wires in the conduit to connect to switchboard circuit breaker.
Note: The circuit breaker can be installed
immediately after
the main switch to avoid a network
disconnection / reconnection in regions that require the network or authorised contractor to isolate
the supply.
D. Connect an earth wire from the unit to the main earth bar connection in the switchboard.
E. Check all mechanical wiring connections are secure and making full contact. Ensure the output
neutral connections are as per your relevant wiring diagram.
WARNING
:
Do
NOT
install EdgeIQ on installations
with
three phase
OR
two phase
supply
as this can
UNBALANCE
the voltages and cause damage to the installation or appliances on the installation.
Three
phase
Edge IQ is available with a 3 phase adaptor, please contact
for further support.