6
E D G E I Q H A N D B O O K
2.
‘M U S T G E T’ I N F O R M A T I O N
Electrical contractor must complete the below information and return this page to Edge Electrons at
[email protected] as soon as possible after commissioning the unit. Receipt by Edge is
required to validate the Edge Electrons product warranty.
2.1. For the customer to register their unit
a) Has the unit been commissioned with the EdgeConnected installer app?
Apple:
https://apps.apple.com/au/app/edgeconnected/id1465549819
Android:
https://play.google.com/store/apps/details?id=com.edgeconnected.installer&hl=en_AU
2.2. Electrical contractor
a) Has the customer been informed a shutdown will be required for installation?
b) A Certificate of Electrical Safety will be provided to the customer?
c) Has a positive communication been established for the unit, prior to leaving
customer site?
(See
Commission Checklist – Section D
for how to check for this)
2.3. Photographs/Video required
a) Main switchboard internal and external, including circuit breaker panel
b) Existing solar equipment installed
c) Proposed and actual location of install and breaker location (Need ‘before and after’, including
main switchboard)
d) Photos of general hazards and/or access hazards relevant to the install – e.g. Gas outlets
Note: Should you consider a problem with the EdgeIQ unit installed, please take videos/photos to
explain the issue and include in the Return Merchandise Authorisation form.
No provision of
video/photo explanation of the issue is likely to impact the warranty.
Electrical contractor details
Name:
Phone:
Email:
Business address:
Licence number:
Summary of Contents for EDGEIQ EE-202-0050
Page 1: ...1 2 3 INSTALL THE WORLD S BEST VOLTAGE OPTIMISATION TECHNOLOGY ...
Page 2: ......
Page 31: ......