23
E D G E I Q H A N D B O O K
B.1
Perform
continuity test
and confirm that
polarity
is correct for all cables
Note: Do not close cover of the EdgeIQ unit yet as
further test required
Please tick when this step is completed:
Line YES
Neutral YES
Earth YES
B.2
Perform
visual inspection:
Check that all cables are secure and undamaged,
cable support systems and cable protection are
also secure and undamaged.
Please tick when this step is completed:
Yes
B.3
Perform i
nsulation resistance
test on cables
supplying EdgeIQ
Note: Disconnect wires from terminals, use 250v
setting only. Reconnect wires once test has been
completed.
Please tick when this step is completed:
Yes
Result Active & Neutral to
Earth:______________ MΩ
B.4
Perform
insulation resistance
test on cables
from EdgeIQ back to switchboard
Note: Disconnect wires from terminals, use 250v
setting only. Reconnect wires once test has been
completed.
Please tick when this step is completed:
Yes
Result Active & Neutral to
Earth:______________ MΩ
B.5
Perform a
prospective short circuit current
test
on the incoming mains supply (between Active
and Neutral):
1. Connect your installation testing device (e.g.
Fluke 1664) to the incoming active (line side
terminal of the main switch)
2. Connect second test lead to the main neutral
Bar
3. On PSSC / High Current setting perform test
and record result
Please tick when this step is completed:
Yes
Supply A – N Result:
_____________________ Amps
Note: Circuit breaker main switch fault rating must be
rated higher than test result.
Note: Circuit breaker as an isolator can be installed
immediately after main switch to avoid a network
disconnection / reconnection.