INSTALLING THE PDU
EATON
Powerware
®
225 kVA PDU Installation and Operation Manual
S
164201629 Rev D
www.powerware.com
3−7
3.5
Initial Startup
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on page 10−1 become void. This
service is offered as part of the sales contract for the PDU. Contact service in
advance (usually a two−week notice is required) to reserve a preferred startup date.
3.6
Completing the Installation Checklist
The final step in installing the PDU is completing the following Installation Checklist.
This checklist ensures that you have completely installed all hardware, cables, and
other equipment. Completing all items listed on the checklist will ensure a smooth
installation. Make a copy of the Installation Checklist before filling it out, and retain the
original.
After the installation is complete, a service representative will be able to verify the
operation of the PDU and commission it to support the critical load. The service
representative cannot perform any installation tasks other than verifying software and
operating setup parameters. Service personnel may request a copy of the completed
Installation Checklist to verify all applicable equipment installations have been
completed.
NOTE
The Installation Checklist MUST be completed prior to starting the PDU for the first time.
Installation Checklist
-
All packing materials and restraints have been removed from each cabinet.
-
The PDU is placed in its installed location.
-
The PDU cabinet is secured in position with leveling feet lowered until the cabinet is not resting on the casters and the
cabinet is level.
-
All conduits and cables are properly routed to the PDU.
-
All power cables are properly sized and terminated.
-
Distribution panel branch circuit breakers are installed and wired to load. (Optional)
-
A ground conductor is properly installed.
-
Air conditioning equipment is installed and operating correctly.
-
The area around the installed PDU is clean and dust-free. (The PDU must be installed on a level concrete or
non−combustible floor suitable for computer or electronic equipment.)
-
Adequate workspace exists around the PDU and other cabinets.
-
Adequate lighting is provided around the PDU.
-
A 120V service outlet is located within 7.5 meters (25 feet) of the PDU.
-
Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.
Summary of Contents for Powerware 225 kVA Three-Phase Power Distribution Unit
Page 141: ......
Page 142: ... 164201629D 164201629 D ...