43
GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN
January 2022 www.eaton.com
00
Title
Step 2 .
Remove the AC platform (1) by disconnecting the power input (4), the power output (2), the wires from the
control connector (3) and any wires connected on header J7 (5) or J9 (6).
Step 3 .
Unscrew the screws located in the four corners of the platform.
Step 4 .
Remove CAREFULLY the platform from the housing and flip it to access the Control unit (PCB) located behind
the AC board. Handle the 4G antenna gently to avoid any damage.
Figure 28 . Wiring diagram of the CU (PCB) inside the Green Motion Building EV charger
Tag
Description
1
Raspberry Pi location
2
Microcontroller
3
4G modem location (optional)
4
DIP switches
5
HDMI connector
6
USB connector
Tag
Description
7
Ethernet connectors
8
RFID connector (optional)
9
LED strip connector
10
Connector to AC board
11
Control pilot connectors
8
9
10
3
1
5
6
7
11
4
2