41
GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN
January 2022 www.eaton.com
00
Title
10.1 How to open/close the housing of the Green Motion Building EV charger
Before attempting to open the EV charger, ensure that the external AC-line main switch is disconnected, and
circuit breakers are open.
When removing the front cover, be careful not to damage the cable connections.
Follow these steps to open the Green Motion Building EV charger housing:
Step 1 .
Unscrew the eight screws of the EV charger housing.
Figure 26 . Location of the eight screws of the Green Motion Building EV charger housing
Step 2 .
Lift and carefully remove the front cover. Do not break any cables from the electrical board.
Step 3 .
Disconnect the connection cables from the front cover.
RFID