GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN January 2022 www.eaton.com
00 Title
Figure 19 . Ethernet port locations on the Control unit (PCB) inside the Green Motion Building EV charger –
Front view
Tag
Description
1
Ethernet port LAN 1GBs
2
Edge of PCB
7.2 Master and Nodes
The EV chargers participating in the network will have to be configured either as a Master or as a Node of the network.
Master EV charger:
An EV charger configured as Master exerts total control over and initiates commands to the
other EV chargers in the network, i.e. the Nodes. Any Green Motion Building EV charger can
be selected as the Master. If communication with the backend is done via 4G, the Master
will have to be equipped with the 4G SIM card.
Node EV charger:
An EV charger configured as Node responds to the commands of the Master EV charger in
the network. The number of nodes is limited to 50.