32
GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN January 2022 www.eaton.com
00 Title
7.4 Wireless network
It is possible to connect the EV chargers between themselves and to the backend through wireless connection.
The connection between EV chargers is facilitated by a Wi-Fi router and the connection to the backend is done through
Wi-Fi or 4G.
If an energy meter is used, it needs to be connected either to the Master or to the Wi-Fi router with an RJ45 cable.
If the energy meter is connected to the Master with an ethernet cable, it is recommended to configure the EV charger
nearest to the energy meter as Master to limit the length of the ethernet cable.
Figure 21 . Wireless communication between EV chargers and to the backend
Tag
Description
1
Green Motion Building EV charger Master
2
Green Motion Building EV charger Node
3
RJ45 cable from energy meter to either Master EV charger or Wi-Fi router
4
Energy meter
5
Wi-Fi router
1
2
2
2
3
4
5
3