23
GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN
January 2022 www.eaton.com
00
Title
Table 9 . Recommended tripping coil/shunt trip
Refer to Section 6.2 for recommendations regarding the connection to the grid.
If the earthing system is a TT or a TN, the ground resistance must not exceed 100 Ohms. Power supply can
be protected with a surge protection device type 2.
Figure 11 . The Green Motion Building EV charger wiring diagram with external switching device
Tag
Description
1
Grid
2
Circuit breaker
3
Type A RCD according to IEC 61851-1:2017
4
Green Motion Building EV charger
5
Shunt trip
Type
Eaton reference
Tripping coil/shunt trip
ZP-ASA/24
6.5.2 Installation of an external switching device
Eaton recommends the use of the following tripping coil/shunt trip:
Please be advised that the recommended tripping coil/shunt trip ZP-ASA/24 will not fit onto a one module
sized, 1P+N circuit breaker.
4
L1
L2
L3
N
PE
L1
L2
L3
N
PE
E
3
2
1
Step 1 .
Open the Green Motion Building EV charger. See Section 10.1.
Step 2 .
Access the Control unit. See Section 10.2.
Step 3 .
Locate the header J9.
To connect the shunt trip to the Green Motion Building EV charger, follow these steps: