20
GREEN MOTION BUILDING INSTALLATION MANUAL
MN191028EN January 2022 www.eaton.com
00 Title
Figure 9 . How to wire AC distribution grid wires to the power supply terminal of the Green Motion
Building EV charger
6.4 Charging current limitation
By default, the charging current is limited to 32 A for the Green Motion Building 22 kW EV charger.
In case the maximum capacity of the electrical installation is lower than 32 A, the maximum charging current
for the Green Motion Building EV charger can be reduced through a DIP switch located on the backside of
the Green Motion Building front cover.
In the event of damage caused by improper current adjustment, the product guarantee is void and no returns
will be accepted. Eaton declines any responsibility for improper current adjustment and cannot be liable for
any inappropriate operation.
Tag
Description
A
Three-phase terminals L1, L2, L3, N and PE
B
Single-phase terminals L1, N and PE
L1 PE
N
L3
L2
L1 PE
N
A
B
Please note: the switch positions in Table 7 are given for an orientation where the label DP1 is located on
the left side of the switch.
Step 5
. Close the housing of the Green Motion Building EV charger.
Step 1 .
Open the housing of the Green Motion Building EV charger. Refer to Section 10 of this manual for detailed
instructions.
Step 2 .
Locate the DIP switch 1 on the LED-panel on the backside of the Green Motion Building EV charger front
cover. See Figure 10.
Step 3 .
Determine the maximum capacity of the electrical installation in which the Green Motion Building EV charger is
installed.
Step 4 .
Use Table 7 to select a maximum charging current for the EV charger LOWER than the maximum capacity of
the electrical installation and configure the DIP switch 1 accordingly.
To limit the maximum charging current for the Green Motion Building EV charger, follow these steps: