
Eaton 93E UPS 15-80 kVA (380/400/415 V)
Installation and Operation Manual
© Eaton Corporation plc 2015. All rights reserved.
Revision: 001
Document ID: 614-01975-00
96 (133)
Function
Sub-function
Operation
Meters
The Meters Setup screen allows you to
select the Meters Screen display style. Use
the or push button to highlight
Meters, then press the
push button to
display the Meters screen. Use the or
push button to highlight the desired style,
then press the
push button. To return
to the System Setup screen, press the ESC
push button.
Lamp Test
The Lamp Test screen allows you to test the
control panel status lamps. Use the or
push button to highlight Lamp Test, then
press the
push button to illuminate the
status lamps. To return to the System Setup
screen, press the ESC push button.
Clear Log
The Clear Log screen allows you to clear the
history log. Use the or push button to
highlight Clear Log, then press the
push
button to clear the log. To return to the
System Setup screen, press the ESC push
button.
P/W
The P/W screen is used to change the
System Setup Level 1 password. Use the
or push button to highlight P/W, then
press the
push button to display the
P/W screen. Use the
or
push button
to select the password character position.
Use the or push button to change the
password character. Once the password is
entered, select CHANGE and then press the
push button.
Controls
See Section 7.2.7 for details.