User Manual 200 kVA-1200 kVA UPS
3 Installation
40
The wiring diagram for auxiliary contact of the battery switch is shown in Fig. 3-24
Fig.
3-24 wiring diagram of auxiliary contact of battery switch
The wiring diagram of forced bypass dry contact is shown in Fig. 3-25.
Fig.
3-25 wiring diagram of forced bypass dry contact
3.4 Installation Inspection
The inspection items and acceptance criteria are shown in Table 3-9.
Table 3-9 Inspection items and acceptance criteria
No. Inspection items
Acceptance criteria
1
Inspect whether the system configurations are
consistent with the shipped those
The field system model and number of units should be
consistent with those specified in the contract.
Summary of Contents for EA990 Super
Page 1: ...200 kVA 1200 kVA ...