User Manual 200 kVA-1200 kVA UPS
3 Installation
24
3. 2. 4 Connection of Power Cable
Step 1:
open the front door of the input/output wiring cabinet (for the fully equipped model, continue to remove
the distribution switch baffle, as shown in Fig. 3-9 and Fig. 3-10).
Fig. 3-9 Distribution switch baffle of full equipped 200 kVA/250 kVA/300 kVA
Mains input
Bypass input
Maintenance bypass
Output
Distribution
switch
baffle
Summary of Contents for EA990 Super
Page 1: ...200 kVA 1200 kVA ...