Item Designation
Brief description
20
Screed position
A Lift the screed.
B Lock the screed (the position appropriate for inserting the
transportation safeguard of the screed)
C: Lower the screed and set it to „Floating position“
m
During paving, the screed must always be in the float-
ing position. The same applies to temporary stops and
the case of changing trucks.
21
Screed control
in case of stopped
paver finisher
With this function the hydraulic unit of the screed can be con-
trolled to prevent the lowering of the screed, when the paver is
stopped (temporary stopping).
A automatic- if the drivearm (9) is in central position, in case
of stopping the paver, the screed is controlled by about 20
bar preliminary pressure.
-
Position C can be used for setting the paver, position A
can be used for paving.
C: switched off- if the drivearm (9) is in central position, in
case of stopping the paver, the screed is only maintained
in floating position / controlled.
f
In case of transportation or maintenance operations al-
ways insert the mechanical transportation safeguard of
the screed.
22
creed loading /
unloading
The screed can be thus loaded or offloaded to change the
traction force or compacting.
A: Relieving (screed ‘lighter’)
B: Function Off
C: Charging (screed ‘heavier’)
- With the help of pressure regulating valve (93) the height of
loading and offloading must be adjusted.
- For the function „Stop screed with prestressing“ select posi-
tion A (see switch (21b) and pressure regulator valve
(93a)).
23
Starter switch
„Temporary pres-
sure load when
laying is started“
To start the screed with preselected pressure load.
- The time limit can be set between 0.5 and 30 sec.
A
This function prevents the floating of the screed, e.g. in
case of temporary stopping or changing trucks.
After the expiry of the preset delay time of the pressure load,
the machine automatically switches to floating position.
A
B
C
A
C
A
Summary of Contents for Svedala Demag DF 115 P/D
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 60: ...D 1 3 4 D_1 3_01_GB fm 4 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 62: ...D 1 3 6 D_1 3_01_GB fm 6 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 80: ...D 1 3 24 D_1 3_01_GB fm 24 24...
Page 120: ...D 4 5 24 D_4 5_01_GB fm 24 34 2 2 Error messages...
Page 121: ...D 4 5 25 D_4 5_01_GB fm 25 34...
Page 122: ...D 4 5 26 D_4 5_01_GB fm 26 34...
Page 123: ...D 4 5 27 D_4 5_01_GB fm 27 34...
Page 124: ...D 4 5 28 D_4 5_01_GB fm 28 34...
Page 125: ...D 4 5 29 D_4 5_01_GB fm 29 34 2 3 FMI codes...
Page 142: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 148: ......
Page 150: ......
Page 153: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 157: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 164: ......
Page 176: ......
Page 177: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 190: ......
Page 218: ......
Page 219: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 224: ......
Page 232: ......