C 1.0 10
C_1
.0_0
1_G
B.
fm
1
0
-1
2
5
Towing
f
Heed all regulations and apply all safety measures applicable for towing heavy con-
struction machines.
m
The towing vehicle must be capable of securing the paver, even on slopes.
Use only approved tow bars!
If necessary, remove any attachments and accessories from the paver finisher and
the screed until the basic width has been attained.
The engine compartment holds a hand-pump on the LH side, which must be actuated
to permit the towing of the machine.
Pressure for releasing the traction system brakes is built up with the hand pump.
m
Only release the traction system brakes
when the machine is sufficiently secured
against accidental rolling or is already
properly connected to the towing vehi-
cle.
- The two high pressure cartridges (1)
of the pumps of the traction drive must
be driven out by about 3 turns.
- Release lock nut (2), screw threaded
dowel (3) into pump as far as possible
and secure with lock nut.
- Actuate lever (4) of hand pump until
sufficient pressure has been built up
and traction system brakes have been
released.
- Attach the tow bar to the coupling (5)
located in the bumper.
A
Now carefully and slowly tow the paver
finisher out of the construction area.
m
Always only tow the shortest distance to
the means of transport or the next park-
ing possibility.
Pump634.jpg
1
Pump
4
3
2
X
Summary of Contents for Svedala Demag DF 115 P/D
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 60: ...D 1 3 4 D_1 3_01_GB fm 4 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 62: ...D 1 3 6 D_1 3_01_GB fm 6 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 80: ...D 1 3 24 D_1 3_01_GB fm 24 24...
Page 120: ...D 4 5 24 D_4 5_01_GB fm 24 34 2 2 Error messages...
Page 121: ...D 4 5 25 D_4 5_01_GB fm 25 34...
Page 122: ...D 4 5 26 D_4 5_01_GB fm 26 34...
Page 123: ...D 4 5 27 D_4 5_01_GB fm 27 34...
Page 124: ...D 4 5 28 D_4 5_01_GB fm 28 34...
Page 125: ...D 4 5 29 D_4 5_01_GB fm 29 34 2 3 FMI codes...
Page 142: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 148: ......
Page 150: ......
Page 153: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 157: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 164: ......
Page 176: ......
Page 177: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 190: ......
Page 218: ......
Page 219: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 224: ......
Page 232: ......