3
34
_DF115PD_
D
F
125PD_O
M
M
_
CO
N_02_G
BI
VZ.
fm
3-
8
D3.0
Operation ................................................................................. 1
1
Operating elements on the paver finisher .................................................. 1
Batteries (71) ......................................................................................... 1
Battery main switch (72) ........................................................................ 1
Transport safeguards for the hopper (73) .............................................. 2
Mechanical screed transport safeguard
(to the left and the right beneath the driver’s seat) (74) ......................... 3
Seat lock (behind the driver’s seat) (75) ................................................ 3
Service brake („foot brake“) (76) ............................................................ 4
Separator fluid spraying system (80) (o) ................................................ 5
on / off switch for additional headlight in the roof (85): .......................... 6
On / off switch for fuel tank filler pump (85a) ......................................... 6
On / off switch special lighting (85b) ...................................................... 6
On / Off switch Exhaust of asphalt vapours (85c) .................................. 6
On/Off switch of work headlights (85d): ................................................. 7
On/Off switch of flasher (85e): ............................................................... 7
230 V On / Off switch Connection sockets (85f) .................................... 7
Locking of the collapsible roof (LH and RH on the roofs console) (86): . 7
Hydraulic folding roof (87) (o) ............................................................... 8
Electric setting of the transportation volume of the conveyor (o) (88) .... 9
Conveyor limit switches (89) .................................................................. 9
Ultrasonic auger limit switches (90) (left and right) .............................. 10
Sockets for working lights (left and right) (92) ..................................... 10
Pressure control valve for screed charging/relieving (93) .................... 11
Pressure control valve for screed stop with pretensioning (93a) ......... 11
Pressure gauge for screed charging/relieving and screed stop
with pretensioning (93b) ...................................................................... 11
Front wheel drive pressure regulating valve (94) (o) ........................... 12
Pressure gauge of the front wheel drive (94a) (o) ............................... 12
Central lubrication unit (o) (100) .......................................................... 13
Particle filter - control light (102) (o) .................................................... 14
Front and side window (o) (103) .......................................................... 15
Adjustment of screed eccentric (o) (104) ............................................. 16
Summary of Contents for Svedala Demag DF 115 P/D
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 60: ...D 1 3 4 D_1 3_01_GB fm 4 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 62: ...D 1 3 6 D_1 3_01_GB fm 6 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 80: ...D 1 3 24 D_1 3_01_GB fm 24 24...
Page 120: ...D 4 5 24 D_4 5_01_GB fm 24 34 2 2 Error messages...
Page 121: ...D 4 5 25 D_4 5_01_GB fm 25 34...
Page 122: ...D 4 5 26 D_4 5_01_GB fm 26 34...
Page 123: ...D 4 5 27 D_4 5_01_GB fm 27 34...
Page 124: ...D 4 5 28 D_4 5_01_GB fm 28 34...
Page 125: ...D 4 5 29 D_4 5_01_GB fm 29 34 2 3 FMI codes...
Page 142: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 148: ......
Page 150: ......
Page 153: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 157: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 164: ......
Page 176: ......
Page 177: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 190: ......
Page 218: ......
Page 219: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 224: ......
Page 232: ......