2
34
_DF115PD_
D
F
125PD_O
M
M
_
CO
N_02_G
BI
VZ.
fm
2-
8
7
EN standards ........................................................................................... 21
7.1
Continuous sound level DF115P/D, Deutz TCD2013L04 ........................ 21
7.2
Operating conditions during measurement .............................................. 21
7.3
Measuring point configuration .................................................................. 21
7.4
Continuous sound level DF125P/D, Deutz TCD2013L06 ........................ 22
7.5
Operating conditions during measurement .............................................. 22
7.6
Measuring point configuration .................................................................. 22
7.7
Vibration acting on the entire body .......................................................... 23
7.8
Vibrations acting on hands and arms ....................................................... 23
7.9
Electromagnetic compatibility (EMC) ....................................................... 23
C1.0
Transportation ......................................................................... 1
1
Safety regulations for transportation .......................................................... 1
2
Transportation on low-bed trailers ............................................................. 2
2.1
Preparations ............................................................................................... 2
2.2
Drive onto the low-bed trailer ..................................................................... 4
2.3
Secure the paver finisher in its position to the low-bed trailer: ................... 5
2.4
After transportation .................................................................................... 5
3
Transportation ............................................................................................ 6
3.1
Preparations ............................................................................................... 6
3.2
Traction drive: ............................................................................................ 8
4
Loading by crane ....................................................................................... 9
5
Towing ..................................................................................................... 10
6
Safely parking the vehicle ........................................................................ 12
D1.3
Operation ................................................................................. 1
1
Safety regulations ...................................................................................... 1
2
Operating elements .................................................................................... 2
2.1
Operating panel ......................................................................................... 2
3
Remote control ......................................................................................... 21
Front side ............................................................................................. 22
Reverse side ........................................................................................ 23
Summary of Contents for Svedala Demag DF 115 P/D
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 60: ...D 1 3 4 D_1 3_01_GB fm 4 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 62: ...D 1 3 6 D_1 3_01_GB fm 6 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 80: ...D 1 3 24 D_1 3_01_GB fm 24 24...
Page 120: ...D 4 5 24 D_4 5_01_GB fm 24 34 2 2 Error messages...
Page 121: ...D 4 5 25 D_4 5_01_GB fm 25 34...
Page 122: ...D 4 5 26 D_4 5_01_GB fm 26 34...
Page 123: ...D 4 5 27 D_4 5_01_GB fm 27 34...
Page 124: ...D 4 5 28 D_4 5_01_GB fm 28 34...
Page 125: ...D 4 5 29 D_4 5_01_GB fm 29 34 2 3 FMI codes...
Page 142: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 148: ......
Page 150: ......
Page 153: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 157: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 164: ......
Page 176: ......
Page 177: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 190: ......
Page 218: ......
Page 219: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 224: ......
Page 232: ......